acking Column Installation
Erection and alignment of distillation, absorption, or stripping columns equipped with structured or random packing.
Handling glass, ceramic, metal, or plastic packings according to process requirements.
Ensuring proper support, sealing, and load distribution for safe and efficient column operation.
Distribution System Installation
Installation of liquid and vapor distribution systems inside columns, including redistributors, liquid collectors, and spray nozzles.
Ensures even distribution across the packed bed to optimize mass transfer efficiency.
Includes pipework connections, manifolds, and support structures.
Alignment & Commissioning
Precise leveling, vertical alignment, and squareness checks of the column.
Integration of packing and distributors with existing process lines and vessels.
Testing and verification of flow distribution and operational readiness.
Support & Ancillary Works
Fabrication and installation of supports, ladders, platforms, and access points.
Coordination with civil, mechanical, and process teams for complete turnkey installation
Malaysia