2025 in Review
2025 in Review

 1

2025 in Review

In 2025, across 19 projects, HSC achieved the following:
  • 28,967m of pipes laid
    • Roughly the straight-line distance of Singapore from north to south tips
  • 356 valves installed
    • Enough for every flat in an average-sized HDB block
  • 5,246 trial holes dug
    • 8 times the volume of the swimming pool at OCBC Aquatic Centre
  • 625 utility network connections / cap offs made
    • A mathematically perfect square (252 or 54)
  • 106,266m2 of road resurfaced
    • 0.0001% of Singapore’s land area



HSC also received the following endorsements:
  • Workforce Singapore’s Workforce Transformation Award
  • Royal Society for the Prevention of Accidents’ Gold Award
  • UN Global Compact’s LowCarbon SG Mark
  • World of Safety & Health Asia’s Industry Initiative Excellence Award



Within the industry and beyond, HSC continues to make a positive and sustainable impact, supporting events organized by various partners, speaking at numerous conferences, as well as standing by communities in need.




We continue to do good in 2026.



Catch us at Geo Connect Asia Booth G24 on 31st March and 1st April 2026.