Project Overview
At EKG M&E Sdn Bhd, we specialize in extending the lifespan of critical HVAC infrastructure. Our team recently completed a specialized refurbishment project on Cooling Tower , focusing on structural integrity and leak prevention through professional cold water basin lamination.
Work Execution Steps
Infill Dismantling: Systematic removal of the cooling tower infill to provide full access to the internal basin structure.
Surface Preparation: Comprehensive cleaning and priming of the cold water basin to ensure maximum adhesion.
Fiberglass Lamination: Application of high-grade fiberglass reinforced polymer (FRP) to create a seamless, waterproof barrier.
Component Inspection: Evaluation of the internal support structure before re-assembling the cooling system.
Why Basin Lamination is Essential
Corrosion Protection: Provides a chemical-resistant layer that shields the basin from water treatment chemicals.
Leak Prevention: Eliminates structural seepage, reducing water wastage and chemical loss.
Cost Efficiency: Refurbishing the basin via lamination is a sustainable alternative to a full tower replacement.
The EKG Commitment
As experts in commercial HVAC preventative maintenance, EKG M&E Sdn Bhd ensures that every step—from dismantling to the final leak test—is handled with engineering precision. Our goal is to ensure your chilled water system operates at peak performance with zero downtime.
Singapore