Installation of New Air Conditioners at Universiti Tun Abdul Razak(UNIRAZAK)
Installation of New Air Conditioners at Universiti Tun Abdul Razak(UNIRAZAK)

 3

Installation of New Air Conditioners at Universiti Tun Abdul Razak(UNIRAZAK)

EKG Project Update: New Air Conditioner Installation at UNIRAZAK

Kuala Lumpur | February 13, 2026EKG M&E Sdn Bhd is proud to announce the successful completion of a new air conditioning installation at Universiti Tun Abdul Razak (UNIRAZAK). This project, centered at Maybank and Level 5, was initiated to modernize the campus's climate control infrastructure and ensure a comfortable, high-performance learning environment for all students and staff.


NEW AIR CONDITIONER INSTALLATION

Scope of Work: High-Efficiency Unit Deployment, Refrigerant Piping Integration, and System Commissioning

1. Problem Statement

The aging cooling units previously serving the campus halls had become a liability to both operational costs and indoor comfort:

  • Thermal Inefficiency: Older units were struggling to maintain setpoint temperatures during peak campus hours.

  • High Maintenance Costs: Frequent mechanical breakdowns were leading to increased downtime and emergency repair expenses.

  • Environmental Impact: The existing systems utilized outdated refrigerants and lacked modern energy-saving technology.

2. Technical Execution

To deliver a sustainable and reliable cooling solution, EKG implemented a comprehensive installation protocol:

  • System Design & Selection: We selected high-efficiency units specifically rated for high-occupancy institutional settings, ensuring rapid cooling and low decibel operation.

  • Precision Piping & Insulation: New refrigerant copper piping was installed using high-grade Armaflex insulation to prevent thermal loss and condensation issues.

  • Structural Integration: Units were mounted using vibration-damping brackets to ensure zero mechanical noise transfer into the classrooms and lecture halls.

  • Digital Commissioning: The system was integrated with smart controllers, allowing for precision scheduling and real-time monitoring of energy consumption.


3. Project Outcome

The transition to the new HVAC infrastructure has resulted in immediate improvements across the campus:

  • Operational Efficiency: An estimated 20% reduction in energy consumption compared to the previous legacy units.

  • Enhanced Comfort: Achieved consistent, even temperature distribution across Maybank Hall and Level 5, even during maximum student occupancy.

  • Reliability: The new installation provides UNIRAZAK with a long-term, low-maintenance cooling solution backed by EKG’s ISO-certified installation standards.


About EKG M&E Sdn Bhd

As a trusted MEP partner in Selangor, EKG M&E Sdn Bhd continues to deliver engineering excellence for Malaysia’s leading educational institutions. We specialize in everything from large-scale industrial HVAC projects to precise commercial installations.

Does your campus or office need a cooling upgrade? Contact us today for a technical site assessment and a custom-engineered installation proposal.

EKG M & E SDN BHD Logo
EKG M & E SDN BHD Singapore
Contact us Singapore flagSingapore