Kuala Lumpur | February 13, 2026 — EKG M&E Sdn Bhd has successfully mobilized for a multi-disciplinary infrastructure project at the CPD Office. This series of updates highlights our team's versatility in managing diverse mechanical and electrical (MEP) requirements, ranging from high-rise air conditioning installations to critical electrical component overhauls and industrial-grade roofing solutions.
Our work at the CPD Office ensures that the facility operates at peak efficiency, combining modern comfort with industrial-grade reliability.
Scope: High-Efficiency Unit Deployment and Site Integration
To modernize the climate control within the CPD Office, EKG managed the secure delivery and installation of new high-performance units.
Precision Handling: We ensured that all units were transported and positioned according to manufacturer specifications to maintain warranty integrity.
Modernization: The new systems utilize advanced inverter technology, significantly reducing the office's energy footprint while providing consistent, silent cooling for the workspace.
Scope: Changing Transformers, Contactors, Overloads, and Capacitor Banks
To ensure the safety and stability of the office's power distribution, our electrical team performed a deep-level component replacement:
Power Factor Correction: By replacing the aged Capacitor Banks, we restored the system’s power factor, eliminating potential utility penalties and reducing heat loss in the wiring.
Protection & Control: The installation of new Contactors and Overload Relays ensures that the office's mechanical equipment is protected from electrical faults and surges.
Scope: Flexible Valve Replacement (Menukar Ganti Flexible Valve)
To address vibration and prevent future leaks, we executed a precision valve replacement within the hydraulic network:
Vibration Isolation: The new Flexible Valves act as mechanical shock absorbers, protecting the broader piping system from the constant resonance of pump operations.
System Integrity: This proactive replacement prevents "pinhole" leaks and catastrophic joint failures, ensuring a dry and safe mechanical room environment.
Scope: Ventilator Turbine Integration and Weatherproof Sealing
To improve the building's thermal regulation and air circulation, our team installed high-volume Ventilator Turbines on the facility roof:
Flashing Integration: Custom-fabricated bases were matched to the roof profile and fixed with industrial-grade fasteners.
Watertight Seal: We applied high-grade sealant around every screw and joint to ensure the installation remains 100% leak-proof during the tropical monsoon season.
Passive Cooling: These turbines allow hot air to escape the upper plenum without using electricity, naturally lowering the indoor temperature.
Based in Selangor, EKG M&E Sdn Bhd is a premier MEP specialist dedicated to technical excellence. From the precision electronics of the CPD Office to large-scale industrial sites, we bring the same level of engineering rigor to every project, ensuring that Malaysia’s corporate infrastructure is built to last.