Air Conditioning Maintenance Report at Kuala lumpur
Air Conditioning Maintenance Report at Kuala lumpur

 6

Air Conditioning Maintenance Report at Kuala lumpur

Air Conditioning Maintenance Report

Date: 27 April 2026

Service Type: Routine Maintenance & Chemical Coil Cleaning

Equipment: Ceiling-Mounted Fan Coil Unit (FCU) / Cassette Unit

Work Completed:

  • Disassembly: Removed external housing, air intake grilles, and drain pan for detailed inspection.

  • Filter Servicing: Extracted primary air filters showing significant dust accumulation. Filters are slated for high-pressure washing.

  • Coil Inspection: Internal evaporator coils inspected; visible residue and biofilm identified on fins, requiring a chemical wash to restore heat exchange efficiency.

  • Drainage Check: Clearings of the condensate tray and internal panels to prevent water leakage and fungal growth.

Technical Observation:

The accumulation of particulates on the mesh filters and moisture on the cooling fins indicates the unit is due for its scheduled chemical treatment to maintain optimal airflow and indoor air quality (IAQ).

EKG M & E SDN. BHD. Logo
EKG M & E SDN. BHD. Philippines
联系我们 Philippines flagPhilippines