What Should Food Manufacturers Do First to Transition to MS 1480:2025?

What Should Food Manufacturers Do First to Transition to MS 1480:2025?

With the introduction of MS 1480:2025, many food manufacturers are unsure where to begin.
A rushed or unstructured transition often leads to audit findings, nonconformities, and rework.

The key to a smooth transition is knowing what to do first—and what to prioritize.


Why MS 1480:2025 Transition Requires a Structured Approach

MS 1480:2025 is not a minor update.
It emphasizes:

  • Stronger risk-based thinking

  • Clear hazard justification

  • Effective system implementation

  • Ongoing verification and review

Transitioning successfully requires system review—not document replacement.


First Things Food Manufacturers Should Do to Transition to MS 1480:2025

1️⃣ Conduct a HACCP Gap Analysis Against MS 1480:2025

This should always be the first step.

Key focus areas:

  • Hazard analysis completeness

  • CCP determination logic

  • PRP effectiveness

  • Verification and validation activities

  • HACCP team competency

A proper gap analysis:

  • Identifies non-compliant areas early

  • Prevents unnecessary documentation changes

  • Sets clear transition priorities


2️⃣ Review and Update the HACCP Hazard Analysis

Common gaps found include:

  • Outdated process flow diagrams

  • Generic hazard identification

  • Missing justification for hazard significance

Under MS 1480:2025, manufacturers must:

  • Link hazards directly to each process step

  • Justify why hazards are significant or not

  • Consider real operational conditions


3️⃣ Reassess CCP Determination and Control Measures

Many existing HACCP plans:

  • Overuse CCPs

  • Lack technical justification

  • Use historical decisions without review

MS 1480:2025 requires:

  • Clear logic for CCP decisions

  • Evidence-based critical limits

  • Defined actions when controls fail


4️⃣ Strengthen Prerequisite Programs (PRPs)

PRPs are a major audit focus under the new standard.

Food manufacturers should review:

  • Cleaning and sanitation effectiveness

  • Pest control monitoring and trend analysis

  • Maintenance and calibration programs

  • Personal hygiene and GMP controls

Weak PRPs often:

  • Lead to HACCP failures

  • Trigger major nonconformities


5️⃣ Verify and Validate Food Safety Controls

Many companies confuse these two activities.

MS 1480:2025 emphasizes:

  • Validation: proving controls work before use

  • Verification: confirming controls work continuously

Manufacturers should:

  • Validate CCPs and OPRPs

  • Review monitoring data trends

  • Conduct internal verification activities regularly


6️⃣ Review Change Management Procedures

Transitioning requires evaluating:

  • New raw materials

  • Supplier changes

  • Process or equipment modifications

  • Production volume changes

MS 1480:2025 expects:

  • HACCP review triggered by change

  • Documented decision-making

  • Updated hazard analysis where needed


7️⃣ Train and Re-Engage the HACCP Team

A major transition failure occurs when:

  • HACCP knowledge stays with one person

  • Team members cannot explain decisions

  • Training is outdated

The updated standard expects:

  • Competent HACCP team members

  • Understanding of risk-based decisions

  • Active participation in system maintenance


What Food Manufacturers Should NOT Do First

❌ Rewrite all documents without gap analysis
❌ Copy templates claiming “MS 1480:2025 compliant”
❌ Wait until the next audit to act
❌ Focus only on paperwork, not implementation


How Long Should the MS 1480:2025 Transition Take?

Transition timelines depend on:

  • HACCP system maturity

  • PRP effectiveness

  • Staff competency

Typically:

  • Simple operations: 2–3 months

  • Complex operations: 3–6 months

Early preparation reduces:

  • Audit pressure

  • Corrective action costs

  • Business disruption


MS 1480:2025 and ISO 22000: Why Alignment Matters

MS 1480:2025 aligns closely with:

  • ISO 22000 risk-based thinking

  • System effectiveness requirements

  • Continuous improvement principles

For manufacturers planning ISO 22000:

  • MS 1480:2025 transition is a critical foundation

  • Weak HACCP systems often lead to ISO audit failure


Final Thought

The first step in transitioning to MS 1480:2025 is not updating documents—it is understanding where your current system truly stands.

Food manufacturers that:

  • Start with a proper gap analysis

  • Focus on real implementation

  • Engage their HACCP team

will experience a smoother, faster, and more successful transition.

CAYS GROUP PLT Logo
CAYS GROUP PLT Philippines
联系我们 Philippines flagPhilippines