Precision 2HP Cassette AC Installation at Wisma Unirazak
Precision 2HP Cassette AC Installation at Wisma Unirazak

 6

Precision 2HP Cassette AC Installation at Wisma Unirazak

Project Spotlight: Precision 2HP Cassette AC Installation

Our technical team recently completed a comprehensive HVAC system upgrade, replacing a failing unit with a high-performance 2HP Cassette AC system. This installation focused on three pillars: thermal efficiency, electrical safety, and long-term durability.

Key Technical Phases

  • Dismantling & Site Prep: Meticulous removal of the faulty existing unit to ensure a clean integration point for the new high-performance hardware.

  • Precision Piping: Installation of premium-grade copper piping, fully encased in high-density thermal insulation. This configuration maximizes cooling efficiency while eliminating potential condensation issues.

  • Industrial-Grade Wiring: To ensure building safety, all new electrical lines were housed within industrial-strength flexible conduits, offering robust protection against environmental wear and tear.

Results

The upgrade provides the client with a professional, streamlined finish and a cooling system optimized for peak energy performance and structural longevity.

EKG M & E SDN. BHD. Logo
EKG M & E SDN. BHD. Philippines
Contact us Philippines flagPhilippines