Horizontal Directional Drilling (HDD) Crossing

Horizontal Directional Drilling (HDD) Crossing

At Eucasper Engineering, we offer specialized HDD (Horizontal Directional Drilling) services tailored for the shore-end installation of submarine cables. Our HDD solutions ensure secure, low-impact landfall operations across diverse environments — from remote beaches to urban waterfronts. We provide end-to-end HDD services designed for submarine cable projects:

1. Feasibility Studies & Route Design

  • Shoreline and seabed assessments

  • Geotechnical & geophysical surveys

  • HDD alignment and bore profile engineering

2. Permitting & Environmental Support

  • EIA assistance and regulatory compliance

  • Environmentally friendly HDD methodology

  • Engagement with local and marine authorities

3. Drilling Operations

  • Pilot bore drilling from shore to offshore exit point

  • Bore enlargement (reaming) to required diameter

  • Installation of HDPE or steel conduit

4. Cable Pull-In & Offshore Integration

  • Cable pull-in from vessel through HDD duct

  • ROV/diver-assisted offshore operations

  • Onshore cable handling and protection

5. Post-Installation Services

  • As-built documentation & bore profile reports

  • Pressure testing and duct integrity checks

  • Optional monitoring and maintenance support