Kuala Lumpur | February 13, 2026 — EKG M&E Sdn Bhd continues to deliver comprehensive MEP solutions with our latest industrial ventilation project. This update documents the precision installation of Ventilator Turbines, a critical component for maintaining optimal airflow and thermal regulation in warehouse and industrial facilities.
Our engineering team followed a strict multi-step protocol to ensure structural integrity and long-term weatherproofing against the Malaysian climate.
Scope of Work: Base Flashing Integration, Turbine Assembly, and Weatherproof Sealing
Large industrial spaces often face significant heat accumulation under metal deck roofing. Without active or passive ventilation, this trapped heat can increase indoor temperatures, affect equipment performance, and reduce worker productivity. The challenge is to install high-volume ventilators while ensuring a 100% watertight seal on a corrugated metal surface.
To achieve a durable and efficient installation, EKG performed the following steps:
Flashing & Base Installation: The custom-fabricated base was prepared to provide a stable foundation for the turbine.
Alignment with Metal Deck: Our technicians meticulously positioned the flashing to perfectly match the profile of the metal deck roofing, ensuring a flush fit that prevents water pooling.
Mechanical Fastening: The flashing was fixed securely to the roof structure using industrial-grade self-tapping screws.
Ventilator Neck Integration: The ventilator neck was inserted into the flashing base, providing the transition point between the interior air space and the exterior turbine.
Turbine Assembly: The high-performance ventilator turbine was mounted onto the neck, utilizing low-friction bearings to ensure continuous rotation even in low-wind conditions.
Precision Weatherproofing: To guarantee a leak-free result, EKG applied high-grade industrial sealant around all screws and joints, creating a permanent barrier against moisture.
Thermal Regulation: The new ventilator turbines effectively exhaust hot air from the building’s upper plenum, reducing the overall cooling load on the HVAC system.
Durability: The use of high-quality flashing and professional-grade sealants ensures the installation remains watertight under heavy tropical rainfall.
Energy-Free Operation: These passive ventilation units operate without electricity, providing a sustainable and cost-effective solution for facility climate control.
Based in Selangor, EKG M&E Sdn Bhd is a premier MEP specialist dedicated to technical excellence in mechanical, electrical, and plumbing infrastructure. From complex HVAC restorations to specialized industrial roofing components, we provide the expertise needed to maintain Malaysia’s commercial and industrial assets.
Is your facility struggling with heat accumulation? Contact us today for a professional site audit and a customized ventilation proposal.
Indonesia