Plan A Two-Trip Formaldehyde Removal Treatment Service**

Plan A Two-Trip Formaldehyde Removal Treatment Service**

**Plan A Two-Trip Treatment Service**


**1st Treatment (Before Cabinet Installation)**

We will conduct the first treatment **on the wall-facing sides** before the built-in cabinets are installed.

If your custom cabinets require two separate installation visits, we will also need to arrange two trips for treatment.


**2nd Treatment (After Renovation & Cleaning)**

Once renovation is completed, cleaning is done, and **curtains, sofa, bed frame, and all loose furniture** have been moved in, we will return to perform the **final formaldehyde test and full treatment**, ensuring the indoor air quality meets the safety standard (≤0.1ppm).