EKG Project Update: Specialized Chemical Restoration at Lot 10
EKG Project Update: Specialized Chemical Restoration at Lot 10

 8

EKG Project Update: Specialized Chemical Restoration at Lot 10

EKG Project Update: Specialized Chemical Restoration at Lot 10

Kuala Lumpur | February 13, 2026EKG M&E Sdn Bhd recently executed a specialized technical service at the iconic Lot 10 shopping center in Bukit Bintang. In high-traffic retail environments, maintaining the hygiene and thermal efficiency of the HVAC (Heating, Ventilation, and Air Conditioning) system is a top priority.

Our "Chemical" service at Lot 10 focuses on the deep restoration of cooling components to ensure a premium shopping experience for visitors and optimal operating conditions for tenants.


HVAC CHEMICAL CLEANING & RESTORATION

Scope of Work: Chemical Coil Descaling, Condensate Tray Sanitization, and System Performance Recovery

1. The Problem Statement: Retail Environment Challenges

Retail hubs like Lot 10 face unique HVAC pressures:

  • High Particulate Loading: Constant foot traffic introduces high levels of dust and lint into the air, which quickly "mats" on cooling coils.

  • Biological Growth: Moisture in the condensate trays can lead to algae and mold buildup, causing unpleasant odors and potential health risks.

  • Reduced Heat Transfer: When coils are fouled with grime, the system must work significantly harder to maintain the desired indoor temperature, leading to spiked energy costs.

2. Technical Execution: The EKG Chemical Protocol

To restore the units to their peak engineering specifications, EKG implemented a professional-grade chemical treatment:

  • Industrial-Grade Coil Descaling: We applied specialized, pH-neutral foaming agents to the Evaporator Coils and AHU units. This chemical reaction penetrates deep into the fin structure, loosening compacted debris and oxidation that standard vacuuming cannot reach.

  • Condensate Tray Sanitization: All drainage trays were chemically treated to eliminate biological growth and cleared of any blockages. This prevents the "Dirty Sock Syndrome" (odors) and avoids damaging water leaks into retail spaces.

  • System Flushing: Following the chemical application, the units are thoroughly flushed with high-pressure water to remove all neutralized debris, leaving the aluminum fins in a "like-new" metallic state for maximum heat exchange.


3. Project Outcome & Strategic Value

  • Improved Indoor Air Quality (IAQ): The removal of mold and dust ensures a fresh, hygienic environment for Lot 10 shoppers.

  • Immediate Energy Savings: Clean coils allow for faster heat rejection, estimated to reduce the specific unit's power consumption by 10–15%.

  • Odor Elimination: Specialized chemical biocides ensure that the air being circulated remains neutral and free from biological contaminants.


About EKG M&E Sdn Bhd

Headquartered in Kuala Lumpur, EKG M&E Sdn Bhd is a premier MEP specialist serving Malaysia's most prestigious retail and commercial developments. We believe that technical precision and specialized chemical care are the keys to "Engineering Comfort" in high-demand environments like Lot 10.

Is your retail or commercial facility's air feeling "stale" or your energy bills rising? Contact us today for a professional HVAC chemical audit and restoration proposal.

EKG M & E SDN BHD Logo
EKG M & E SDN BHD Indonesia
Contact us Indonesia flagIndonesia