Highlights:
- Operator place Bottom Housing onto the Nest.
- Operator pick up the PCBA and load into the Bottom Housing and load again TFT  Screen on the  holding fixture.
- Operator manually insert the flex from TFT Screen  into the PCBA and then press start button for start the vision inspection.
- The vision camera will inspect the insertion before machine to proceed next step process.
- Once vision checked is pass, then the screw template only will be unlock.
- Operator will flip to close the screw template and the screw template will be locked  to the position before operate can start the screwing process.
- Once the screwing process completed, then the screw template only can be unlocked for operator to open the template and unload the sub assemble product for next  machine. 
 Malaysia
Malaysia