In the world of building services, "MEP Compliant Commissioning" is the systematic process of verifying that the Mechanical, Electrical, and Plumbing components of a booster set are not just installed, but are operating exactly as the engineers designed. For a booster pump, this means the mechanical pump, the electrical motor/VFD, and the plumbing sensors must work in perfect harmony to provide reliable water pressure.
EKG (Malaysia) Sdn Bhd acts as your specialized commissioning partner in Selangor, providing the technical rigor and independent verification needed for a successful building handover.
Before power is applied, we perform a "Static Verification" to ensure the installation is safe and compliant with as-built drawings.
Mechanical: Checking for proper pipe support, vibration isolators, and Laser Shaft Alignment to prevent mechanical stress.
Electrical: Verification of motor nameplate data, insulation resistance (Megger) testing, and grounding continuity.
Plumbing: Ensuring suction diffusers are clean, strainers are free of construction debris, and the system is hydraulically pressure tested.
We energize the system and measure its actual performance against the manufacturer’s design curve.
Flow & Head Measurement: Using ultrasonic flow meters to verify GPM/LPS and pressure gauges to confirm Total Dynamic Head (TDH).
Electrical Data: Recording Amperage, Voltage, and kW draw to ensure the motor is operating at its Best Efficiency Point (BEP).
Vibration Analysis: Measuring baseline vibration levels to ensure they are within ISO 10816 standards for long-term reliability.
This is the "Electrical/Plumbing" integration phase where we test the system's "intelligence."
VFD Tuning: Fine-tuning the PID (Proportional-Integral-Derivative) parameters to ensure the pump ramps up smoothly without "hunting."
Auto-Changeover: Testing the Duty/Assist/Standby logic—ensuring that if Pump A fails, Pump B starts automatically without a pressure drop.
Safety Interlocks: Verifying that "Dry-Run" sensors and high-pressure relief valves activate correctly to protect the building's pipes.
Building Management System (BMS): Confirming that all alarm points, pressure readings, and run-status signals are accurately reflected on the central facility dashboard.
Final Report: Delivering a comprehensive T&C (Testing & Commissioning) Report, including all test data, pump curves, and a formal Certificate of Commissioning for consultant approval.
| Risk of Skipping Commissioning | EKG Technical Solution |
| Hidden Defects | We identify misalignments or wiring errors before they cause a failure. |
| Energy Inefficiency | We verify that the pump is not "over-pumping," which wastes electricity. |
| Water Hammer | We tune VFDs to eliminate the pressure surges that burst pipes. |
| Compliance Gaps | We provide the documentation required for GBI, LEED, or MyHIJAU certification. |
At EKG (Malaysia) Sdn Bhd, we don't just find faults; we have the engineering expertise to fix them on-site. Based in Selangor, we provide independent, third-party verification that protects the building owner's investment and ensures a worry-free project handover.
Are you preparing for a building handover or a system retrofit? Contact us now for a free site assessment and a technical quote on our MEP compliant booster pump commissioning services!
Xem thêm chi tiết về EKG M & E SDN. BHD.
Malaysia