Save Electricity AHU

Category: Variable Frequency Drive (VFD) AHU Integration Available
For more information, visit our official website at eakon.com.my

Description

To save electricity on an Air Handling Unit (AHU) in 2026, you must align your technical upgrades with Malaysia's Energy Efficiency and Conservation Act (EECA) 2024, which became fully enforceable on January 1, 2025.

 

Large energy consumers (using >21,600 GJ annually) are now legally required to appoint a Registered Energy Manager (REM) and implement an Energy Management System (EnMS). For an AHU, this involves moving beyond simple maintenance toward "smart" and "statutory" optimization.

 


1. High-Impact Technical Strategies

The most effective way to reduce AHU power consumption is to modulate airflow and upgrade motor efficiency.


2. Statutory Compliance & Standards (2026)

Your energy-saving measures must comply with the latest Malaysian standards to pass a BOMBA or Energy Commission (ST) audit.


3. Financial Incentives (GITA 2026)

The Malaysian government provides significant tax relief for companies that invest in energy-efficient AHUs before the end of 2026.

Incentive Benefit Requirement
GITA (Tier 1) 100% Tax Allowance Claim against 70% of statutory income for green assets purchased by Dec 31, 2026.
GITA Asset Merger Streamlined Application For 2026, GITA Asset and Project tracks are merged to reduce paperwork for businesses.
TNB MD Savings Reduced Peak Demand VFDs reduce "in-rush current," lowering the Maximum Demand (MD) charges on your monthly TNB bill.

4. Critical Maintenance for Efficiency

Before spending on new hardware, ensure the "passive" elements of the AHU are optimized:

  1. Pressure Drop Management: Change filters when they hit their pressure threshold (typically 200–250 Pa) to stop the fan from working harder than necessary.

  2. Coil Cleaning: Biofilm on cooling coils acts as an insulator, forcing the chiller to work harder. Annual chemical cleaning can improve heat transfer efficiency by 10–15%.

  3. Leakage Audits: Inspect ductwork for air leaks; a 10% leak in the supply duct requires the fan to run significantly faster to maintain zone pressure.

Are you looking to retrofit an existing AHU or specify a new high-efficiency system for a development project?

More detail about EKG M & E SDN BHD
EKG M & E SDN BHD
EKG M & E SDN BHD ACMV Services Kuala Lumpur (KL), Fire Protection Services Selangor, Electrical Engineering Contractor Malaysia ~ EKG M & E SDN BHD
Contact Us flagMalaysia