Maintaining a controlled environment is critical for high-precision industries. We recently completed a specialized HVAC project for Percetakan Nasional Malaysia Berhad (PNMB), focusing on the strategic relocation and installation of heavy-duty cooling units to support their operational needs.
The project involved a two-pronged approach to optimize climate control within their facility:
8HP Ducted Unit Relocation & Installation: We managed the seamless relocation of an 8HP ducted system. This required precise ductwork reconfiguration and refrigerant piping adjustments to ensure the high-capacity unit provides consistent airflow and cooling across its new designated zone.
5HP Cassette Unit Installation: To complement the centralized cooling, a 5HP ceiling cassette unit was installed. This unit provides balanced 4-way airflow, ideal for maintaining temperature stability in open-plan areas or specialized production sections.
Site Assessment: Evaluating the structural requirements for the 8HP ducted unit’s new position to minimize static pressure loss.
Precision Piping: Extending and insulating refrigerant lines to maintain system efficiency and prevent condensation.
Testing & Commissioning: Rigorous load testing to ensure both the ducted and cassette units meet the required thermal benchmarks for PNMB’s specialized printing environment.
By integrating these industrial-grade ACMV solutions, we continue to help our clients ensure that their infrastructure is as reliable as their services.
Looking to upgrade or relocate your industrial cooling systems? Our team specializes in comprehensive MEP and ACMV-R services, from large-scale AHUs to precise cassette installations.
Contact us today to discuss your next project.
Vietnam