As of May 2026, the Energy Efficiency and Conservation Act (EECA) 2024 is in full enforcement across Malaysia.
At EKG (Malaysia) SDN BHD, our commissioning protocols are engineered to satisfy the Suruhanjaya Tenaga (ST) audit requirements, ensuring your facility avoids the statutory fines (up to RM100,000) associated with non-compliance.
Commissioning under the 2026 mandate requires empirical proof that the AHU contributes to a lower Building Energy Intensity (BEI).
SFP Audit (Specific Fan Power): We verify that the IE5 EC Fan Wall or VFD-driven fan does not exceed the statutory 1.6 kW/m³/s limit. This is a "Pass/Fail" metric for many modern energy audits.
Mandatory BEI Labeling: Successful commissioning data is used by your Registered Energy Manager (REM) to calculate the kWh/m²/year required for the mandatory BEI Star Rating Label displayed in your lobby.
EnMS Integration: We verify that the AHU's performance data is accurately pushed to your Energy Management System (EnMS), as required for the annual energy efficiency reports submitted to the Energy Commission.
Our mechanical specialists perform a multi-layered audit to ensure the unit is "Audit-Proof."
| Commissioning Phase | 2026 Statutory Requirement | EKG Implementation |
| Volumetric Traverse | ±10% Design Airflow | AHU Airflow Test to ensure IAQ standards are met without over-ventilation. |
| Leakage Validation | SMACNA Seal Class A | Zero-leakage verification at the Zero-Leakage Snap-Lock Duct Collars. |
| VFD Logic Stress Test | Static Pressure Reset | Proving the BMS can ramp down the fan during partial loads to save energy. |
| Hydronic Verification | High Delta T ($5.5^\circ\text+$ ) | Ensuring the chilled water coil isn't "short-circuiting" energy back to the chiller. |
The success of an EECA-compliant commissioning process depends on the quality of the AHU Ducting Service.
ESP Verification: We measure the actual External Static Pressure against design. If the ductwork is too restrictive, the fan must work harder, spiking your BEI.
Acoustic Signature: We verify the unit operates within the NC 30-35 target. Under the 2026 Indoor Environmental Quality (IEQ) standards, energy efficiency must not come at the cost of occupant comfort.
Trap Prime Validation: We verify the 1:100 statutory slope and P-trap seal. A dry trap is an energy leak (unconditioned air bypass) and a violation of DOSH 2026 hygiene codes.
Commissioning is the final step in securing your annual Fire Certificate (FC) from BOMBA (JBPM) 2026.
FAMS Integration: We trigger the Fire Alarm Monitoring System to witness the Automatic Fire Signal AHU Shut-off.
Damper Response: We physically verify that all Motorized Fire Dampers (MFDs) reach a 100% smoke-tight seal.
BOMBA Audit: The results are recorded in the safety logbook, which must be presented to JBPM officers during their annual site walkthrough.
Technical Integrity: We are installation and T&C specialists, not fabricators.
Audit-Ready Reports: We provide a comprehensive EECA Compliance Report formatted for immediate use by your Registered Energy Auditor (REA).
GITA Prerequisite: Our data provides the technical foundation for your 100% Green Investment Tax Allowance (GITA) application.
Is your AHU commissioning documented for the 2026 statutory energy audit?
Contact EKG (Malaysia) SDN BHD today for a professional EECA 2024 Compliant AHU Commissioning & Performance Audit.