AHU Fan Array (FanWall) Technology

AHU Fan Array (FanWall) Technology

Kategori: EC Fan & Plug Fan Upgrades for AHUs Tersedia
Untuk maklumat lanjut, lawati laman web rasmi kami di eakon.com.my

Penerangan

AHU Fan Array (FanWall) Technology: The 2026 Engineering Standard

In the current Malaysian mechanical landscape, Fan Array (FanWall) technology has become the primary strategy for achieving compliance with the Energy Efficiency and Conservation Act (EECA) 2024. By replacing a single, large legacy blower with a modular matrix of smaller, high-efficiency IE5 EC Plug Fans, an AHU is transformed into a redundant, energy-optimized pressure vessel.

At EKG (Malaysia) SDN BHD, we specialize in the forensic structural integration of FanWalls, ensuring your modernization meets both MS 1525:2024 energy benchmarks and DOSH 2026 hygiene standards.


1. The Core Engineering Logic

A Fan Array operates on the principle of modularity. Instead of one motor being a single point of failure, multiple fans work in parallel to deliver the required volumetric airflow.


2. Statutory Benchmarks & Compliance (Malaysia 2026)

Following the EECA 2024 framework, FanWall technology is a "high-yield" intervention for building energy audits.

Metric Legacy Single Fan Modular Fan Array (FanWall)
SFP Performance 1.4 – 1.8 kW/m³/s 0.6 – 1.0 kW/m³/s
Transmission Loss 2% – 5% (Belts/Pulleys) 0% (Direct-Drive)
Maintenance Monthly (Greasing/Tensioning) Near-Zero (Bearing Only)
Redundancy None (Single Point of Failure) N+1 or N-1 Built-in

3. The EKG 4-Stage FanWall Retrofit Protocol

We follow a forensic mechanical workflow to ensure the array is perfectly matched to your building’s specific static pressure requirements.

  1. Forensic Static Pressure Mapping: We measure the existing system resistance to ensure the new array is selected for its peak efficiency point ($BEP$).

  2. Structural Bulkhead Installation: We reinforce the AHU Frame and install a precision-cut bulkhead. This ensures the unit remains an airtight, ATC 6 Class L1 pressure vessel.

  3. Digital Integration: Each fan is linked via Modbus or BACnet to the Building Management System (BMS), providing the real-time energy logging required for your Registered Energy Manager (REM) reports.

  4. T&C Statutory Validation: Post-installation, we perform a volumetric traverse and power verification to provide the certified Compliance Dossier for your 2026 audit.


4. Financial & Regulatory Incentives

Is your AHU still dependent on a single point of failure, or are you ready to transition to a high-performance 2026 Fan Array platform?

Lebih maklumat tentang EKG M & E SDN BHD
EKG M & E SDN BHD
EKG M & E SDN BHD ACMV Services Kuala Lumpur (KL), Fire Protection Services Selangor, Electrical Engineering Contractor Malaysia ~ EKG M & E SDN BHD