In the 2026 Malaysian regulatory landscape, Building AC Testing—encompassing Testing & Commissioning (T&C) and Performance Audits—is a mandatory statutory requirement. Under the Energy Efficiency and Conservation Act (EECA) 2024 and MS 1525:2024, systems must be verified to ensure they meet strict energy intensity and safety benchmarks.
At EKG (Malaysia) SDN BHD, our testing protocols ensure your facility is Statutory-Compliant, Energy-Optimized, and BOMBA-Ready.
As of 2026, building owners must prove their AC systems adhere to the mandatory Building Energy Intensity (BEI) targets.
Specific Fan Power (SFP) Verification: We measure total fan power against airflow to ensure the system does not exceed the 1.6 kW/m³/s statutory limit.
VFD Modulation Audit: Verification that Variable Frequency Drives (VFDs) are correctly responding to static pressure resets to minimize energy waste.
Enthalpy & Heat Transfer Validation: Using psychrometric mapping to prove the cooling coil is meeting its design latent and sensible loads effectively.
Testing is the primary evidence required for the annual renewal of your building's Fire Certificate (FC). The AC system must be proven to behave correctly during an emergency.
Automatic Fire Signal AHU Shut-off: We witness the hard-wired trigger from the Fire Alarm Monitoring System (FAMS) that kills power to the fans to prevent feeding a fire with oxygen.
Motorized Fire Damper (MFD) Testing: Physical verification that dampers reach a 100% smoke-tight closure within the statutory timeframe.
Smoke Spill & Pressurization: Testing of specialized extraction fans to ensure safe egress routes (stairwells) remain smoke-free at the correct Pascal (Pa) pressure.
For new installations in KL and Selangor, a comprehensive Testing & Commissioning (T&C) report is required for building handover.
Technical Integrity: We are mechanical and T&C specialists, not just fabricators. We use NATA-traceable instruments to provide "audit-proof" data.
GITA Support: Our testing reports provide the technical foundation for claiming the 100% Green Investment Tax Allowance (GITA).
REA/REM Assistance: We format all data specifically to help your Registered Energy Manager (REM) fulfill mandatory statutory submissions to the Energy Commission (ST).
Is your building’s AC system ready for its 2026 statutory audit?
Contact EKG (Malaysia) SDN BHD today for a professional Building AC Testing & Compliance Audit.
Malaysia