AC Performance Audit

Kategori: Testing & Commissioning (T&C) for New AHUs Tersedia
Untuk maklumat lanjut, lawati laman web rasmi kami di eakon.com.my

Penerangan

Testing & Commissioning (T&C): AC Performance Audit for New AHUs

In the 2026 Malaysian regulatory landscape, Testing & Commissioning (T&C) has shifted from a final "checklist" to a mandatory statutory verification process. Under the Energy Efficiency and Conservation Act (EECA) 2024, a new AHU cannot be legally handed over without an AC Performance Audit that proves the system meets its design efficiency and Building Energy Intensity (BEI) targets.

At EKG (Malaysia) SDN BHD, our T&C protocols are engineered to be Statutory-Compliant and Data-Driven, ensuring your investment is verified by mechanical specialists before operations begin.


1. The Statutory Mandate: EECA 2024 & MS 1525

The AC Performance Audit is the primary evidence required by your Registered Energy Manager (REM) to certify the building's energy performance.


2. Core Components of the Performance Audit

Our mechanical specialists utilize high-precision, calibrated instruments to map the AHU's "Actual vs. Design" performance.

Audit Phase Measurement Metric Purpose
Airflow Traverse Pitot Tube / Anemometer Verifies the AHU is delivering the design $m^3/h$ at the required static pressure.
Psychrometric Map Enthalpy / Humidity % Confirms the cooling coil is removing moisture (Latent Load) per MS 1525 standards.
Acoustic Signature Decibel (dB) / NC Level Ensures the unit operates within NC 30-35 for office comfort.
Power Quality Audit Harmonic Distortion / kW Measures the VFD's electrical efficiency and power factor.

3. T&C Engineering: The "Total System" Approach

An EKG AC Performance Audit goes beyond the AHU plant room; we verify the performance at the Terminal Connection Setup.

  1. DALT (Duct Air Leakage Test): We pressurized the ductwork to verify SMACNA Seal Class A compliance. Any leakage found is categorized as "Energy Waste" and must be rectified to pass the audit.

  2. Terminal Balancing: We use Thermal Anemometers at every Ceiling Air Diffuser to ensure air distribution is uniform. This prevents "Hot Spots" that would otherwise force the VFD to run at higher, inefficient speeds.

  3. Static Pressure Reset Test: We simulate partial load conditions to ensure the BMS (Building Management System) correctly "resets" the static pressure setpoint, which is a core requirement for 2026 energy efficiency.


4. The "Fire Mode" Statutory Witness Test

The Performance Audit includes a mandatory "Life Safety" integration test to satisfy BOMBA (JBPM) 2026 regulations.


5. Why Partner with EKG (Malaysia) SDN BHD?

Is your new AHU actually performing at its design efficiency?

Contact EKG (Malaysia) SDN BHD today for a professional T&C: AC Performance Audit to ensure your facility is statutory-compliant from Day 1.