WBS- 30A, 50A, 60A & 80A
 
Single Stage, Carbon Vane Rotary, Air Cooled, 
• Compact Design - Reliability & Durability – Easy to maintain and operate. 
• Simple Installation – Air Cooled, No Water Required – Oil Free 
• Quite Operation. 
• Timing Belt Drive 
• Ideal for Vacuum and Blow Operation 
 
Standard Equipment: 
• Carbon Vanes
• Built-in particulate Filter & Silencer
• Vibration Isolators
• Vacuum gage and Regulator
•  TEFC High Efficiency Motor 
 
Optional Equipment: Pressure Gauge & regulator for Blow operation
.jpg)