Nippon Paint EA9 Finish HB: High-Performance Protective Epoxy Coating

Nippon Paint EA9 Finish HB: High-Performance Protective Epoxy Coating

Category: Paints Available
For more information, visit our official website at hengshenghardware.com.my

Description

PRODUCT OVERVIEW

Nippon Paint EA9 Finish HB (High Build) is a premium two-pack, amine-adduct cured epoxy coating designed for superior corrosion protection. Specifically engineered for durability, this high-build coating is ideal for both immersion and non-immersion services. Whether you are protecting industrial steelwork, storage tanks, or concrete floors, EA9 Finish HB provides a robust, chemical-resistant barrier that ensures long-term structural integrity.

As a food-grade certified epoxy, it is the industry standard for lining storage tanks containing potable water, edible oils (like palm oil), and other aqueous solutions. Its low-gloss finish and high abrasion resistance make it a versatile choice for heavy-duty environments.



TECHNICAL DATA

 

APPLICATION INSTRUCTION

  1. Mixing: Stir the Base component thoroughly. Gradually add the Hardener component and continue stirring until a completely homogeneous mixture is achieved. Allow a 10–15 minute induction time before application.

  2. Methods: * Airless Spray (Preferred): Provides the best high-build finish. Use tip size 0.015”–0.017”                      at 140–170 kg/cm².
                     * Brush/Roller: Suitable for small areas or touch-ups; thinning with up to 5% Nippon SA-                        65 Thinner is recommended for better flow.

  3. Thinning: Use Nippon SA-65 Thinner only. Add 5% for spray/roller and up to 10-15% for compressed air spray if required.



RECOMMENDED COATING SYSTEM (2-3 Points)



SURFACE PREPARATION

  1. Steel: For optimum performance, abrasive blasting to Sa 2½ (ISO 8501-1:1988) is required. Surface must be dry and free from rust, oil, and grease.

  2. Concrete: Surfaces must be fully cured (min. 28 days), clean, and dry. Remove laitance and contaminants via light grit blasting or mechanical grinding.

  3. Moisture Content: Ensure the substrate moisture content is below 6% (measured by a Sovereign moisture meter) and the surface temperature is at least 3°C above the dew point.

  4. Previously Painted Surfaces: Remove all loose or flaking paint. For existing epoxy coatings, the surface must be abraded/sanded to ensure inter-coat adhesion.
  5. Cleaning: Use solvent cleaning (SSPC-SP1) to remove oil, grease, and fatty acids before any mechanical preparation.




Ready to order or need expert advice?
Contact us on WhatsApp now for fast response, latest prices, and product recommendations. Our team is ready to support your project with the right solution—quickly and hassle-free!

 

More detail about Heng Sheng Hardware Sdn Bhd
Heng Sheng Hardware Sdn Bhd
Heng Sheng Hardware Sdn Bhd Hardware Store Dengkil | Building Materials & Construction Supplies Selangor, KL - Heng Sheng Hardware
Contact Us flagMalaysia