HEPA-Integrated AHU Refurbishment KL

HEPA-Integrated AHU Refurbishment KL

分类: Antimicrobial AHU Refurbishment 当前有货
欲了解更多详情,请游览我们的官方网站 eakon.com.my

详情

HEPA-Integrated AHU Refurbishment: KL Statutory Compliance (2026)

In the 2026 Malaysian industrial and healthcare landscape, HEPA-Integrated AHU Refurbishment is a high-precision engineering intervention. Under the Energy Efficiency and Conservation Act (EECA) 2024, DOSH (JKKP) 2026 Hygiene Codes, and MS 1525:2024, retrofitting an existing unit with HEPA filtration is no longer just a filter change—it is a total thermodynamic and structural upgrade of the AHU Box.

At EKG (Malaysia) SDN BHD, we transform legacy commercial AHUs into high-performance, clinical-grade assets. We ensure that the 99.99% filtration efficiency does not compromise your building's energy intensity or structural fire safety. 


1. The Statutory Mandate: DOSH 2026 & EECA 2024

HEPA integration is required for facilities pursuing MOH (Ministry of Health) accreditation or high-tech manufacturing compliance in KL.


2. The 4-Stage AHU Decontamination Handshake

Before HEPA modules are integrated, the existing casing must be biologically stabilized through our proprietary protocol.

Stage Engineering Action Purpose
I: HEPA Extraction Industrial H13 HEPA vacuuming. Removes legacy dust and fiberglass shards that would immediately clog new HEPA filters.
II: Microbial Lysis pH-neutral enzymatic biocides. Chemically ruptures bio-films and fungal roots in the old casing.
III: Thermal Disinfection Vapor treatment at 120°C. Sanitizes deep into panel joints and crevices to ensure a sterile substrate.
IV: ATP Validation Bioluminescence swab testing. Provides empirical proof of a 99.9% reduction in microbial activity before integration.

3. Core HEPA Refurbishment Modules

We re-engineer the internal architecture of the AHU to handle high-efficiency filtration in tropical humidity.

  1. V-Bank HEPA Frames: We install deep-pleat V-Bank frames to maximize surface area. This lowers "Face Velocity," reducing the energy required to push air through the dense media.

  2. Fiber-Free Thermal Overhaul: We replace shedding fiberglass with Fiber-Free Closed-Cell Insulation. This eliminates the risk of fibers clogging the HEPA filters and prevents "The Sponge Effect" that leads to mold.

  3. Silver-Ion (Ag+) Passivation: All internal surfaces are coated with a silver-ion antimicrobial finish. This provides a 24/7 active defense, ensuring the air remains sterile after it passes the HEPA filter.


4. Life-Safety & BOMBA (JBPM) 2026 Integration

A HEPA-integrated unit must satisfy the highest life-safety requirements of BOMBA 2026.


5. Why Partner with EKG (Malaysia) SDN BHD?

Is your AHU ready for the sterile air requirements of 2026?

Contact EKG (Malaysia) SDN BHD today for a professional HEPA-Integrated AHU Refurbishment Audit in Kuala Lumpur.

更多 EKG M & E SDN BHD 相关资料
EKG M & E SDN BHD
EKG M & E SDN BHD ACMV Services Kuala Lumpur (KL), Fire Protection Services Selangor, Electrical Engineering Contractor Malaysia ~ EKG M & E SDN BHD