AHU System Audit

AHU System Audit

分类: AHU and Fan Coil Unit 当前有货
欲了解更多详情,请游览我们的官方网站 eakon.com.my

详情

AHU System Audit | 2026 Strategic Performance by EKG

In the high-stakes mechanical environment of 2026 Kuala Lumpur, an AHU (Air Handling Unit) System Audit is a holistic "physical exam" for your building’s mechanical lungs. Under the Energy Efficiency and Conservation Act (EECA) 2024, which took full effect on January 1, 2025, most commercial and industrial systems are found to operate at 20% to 30% lower efficiency than their design intent due to mechanical wear or sensor drift. Failing an audit is no longer just a cost issue—it is a regulatory risk that can lead to fines and a "Least Efficient" building rating.

As part of our specialized AHU and Fan Coil Unit suite, EKG M&E performs this audit to bridge the gap between "running" and "optimized," focusing on your AHUs, cooling coils, and motor performance.


1. The Three Pillars of an EKG Audit

We evaluate your AHU system across three intersecting performance zones:


2. The EKG "Total-Plant" Audit Protocol

Our engineers use precision diagnostic tools to map your system's true performance, adhering to MS1525:2024 and ASHRAE 111 standards:


3. Regulatory Compliance: EECA 2024 & BEI

An AHU audit is the primary data source for your building's Energy Intensity Label:


4. AHU Audit Grading Matrix

Component Healthy Grade (Green) At-Risk (Amber / Red)
Cooling Coil Delta-P < 150 Pascals > 250 Pa (Deep Clean Needed)
Fan Vibration < 2.5 mm/s > 4.5 mm/s (Imbalance)
Filter Status Low Resistance High Delta-P / Visible Bypass
Motor Amperage Within Nameplate FLA Over-Amperage (Friction/Load)
Airflow Balance +/- 10% of Design > 25% Deviation (Leaky/Choked)

5. Why Trust EKG for AHU Audits?

更多 EKG M & E SDN BHD 相关资料
EKG M & E SDN BHD
EKG M & E SDN BHD ACMV Services Kuala Lumpur (KL), Fire Protection Services Selangor, Electrical Engineering Contractor Malaysia ~ EKG M & E SDN BHD