In the event of a vehicle fire in an enclosed basement, smoke is the primary killer—blinding evacuees and trapping heat within the concrete structure. EKG M & E Sdn Bhd specializes in Car Park Smoke Extraction Systems, engineered to rapidly remove high-temperature toxic gases, maintain a "clear layer" for evacuation, and provide safe access for BOMBA firefighting teams.
High-Temperature Axial Smoke Spill Fans
The core of the system. We install specialized fans rated to operate for 2 hours at $250^\circ\text$. These fans transition from low-speed daily ventilation to 100% capacity "Smoke Mode" instantly upon fire alarm activation.
Induction Jet Fan "Thrust" Technology
Instead of bulky ducts, we utilize high-velocity jet fans to "shove" smoke toward the main extraction points. This prevents smoke from mushrooming (stagnating) and maintains visibility along designated escape routes.
Fire-Rated Ductwork & Shafts
All extraction paths are constructed from heavy-gauge galvanized steel and protected with 2-hour fire-rated wraps or ceramic blankets. This ensures the duct stays structurally sound even when carrying superheated air.
Automatic Fire Damper Integration
We install motorized smoke and fire dampers that interlock with the building’s Fire Alarm Monitoring System (FAMS). These ensure that smoke is extracted from the fire zone while preventing it from spreading to other basement levels.
Make-Up Air (Fresh Air) Coordination
For every cubic meter of smoke extracted, fresh air must be introduced. We balance the "Supply" and "Exhaust" fans to prevent high-pressure zones that could make fire doors impossible to open during an evacuation.
Emergency Power & FRC Cabling
Smoke extraction is a life-safety load. We ensure all fans are wired with Fire Resistant Cables (FRC) and connected to the building's essential generator bus to guarantee operation during a total power failure.
BOMBA Functional & Tenability Testing
We conduct rigorous "Cold Smoke" tests and air-velocity measurements to certify that the system meets UBBL requirements. We verify that the "smoke layer" remains at least 2.5 meters above the floor for safe egress.
BOMBA & UBBL Compliance Experts
We ensure your system provides the mandatory 10 Air Changes per Hour (ACH) for smoke spill mode, facilitating a smooth process for your annual Fire Certificate (FC) renewal.
M&E Engineering Precision
As an engineering firm, we calculate the Total Static Pressure ($P_s$) and thermal expansion variables to ensure your fans and supports don't fail under the extreme stress of a real fire.
Strategic Support in KL & PJ
We have extensive experience managing the complex life-safety infrastructure of high-rise developments and shopping malls in Kuala Lumpur and Petaling Jaya, where high occupancy makes smoke control a non-negotiable priority.
Malaysia