Certified, documented validation for all building water systems at handover.
MEP compliant water pump commissioning is a rigorous, systematic process to verify that every pump system—HVAC, plumbing, fire protection—is installed correctly, operates as designed, and meets all relevant codes and the owner's project requirements. EKG Malaysia provides certified commissioning services across Malaysia, delivering a fully tested, documented, and operational building to owners and facility managers.
Our Commissioning Scope for MEP Systems:
HVAC Systems:
Chilled Water Pumps (Primary, Secondary, VPF)
Condenser Water Pumps & Cooling Tower Circulation
Heating Hot Water Pumps
Plumbing Systems:
Domestic Water Booster Pump Sets
Sump, Sewage & Ejector Pumps
Fire Protection Systems:
Electric & Diesel Fire Pumps (to NFPA 20 standards)
Jockey Pumps
Specialty Systems:
Process Cooling Pumps
Irrigation & Water Feature Pumps
The Structured Commissioning Process:
Phase 1: Pre-Commissioning Documentation & Planning
Review design specifications, pump submittals, and as-built drawings.
Develop detailed commissioning plans, test procedures, and checklists compliant with BSRIA, ASHRAE Guideline 0/1.1, and local codes.
Phase 2: Static Inspection & Verification
Mechanical: Laser shaft alignment verification, baseplate grouting, pipe support/strain inspection.
Electrical: Motor nameplate confirmation, insulation resistance (Megger) testing, starter/control wiring checks.
Safety: Confirmation of all safety devices, relief valves, and interlocks.
Phase 3: Dynamic Performance Testing
Initial start-up under supervision.
Instrumented measurement of Flow, Head, Power (kW), Current, and Vibration.
Validation against manufacturer's pump curves to confirm operation at or near Best Efficiency Point (BEP).
System balancing to achieve design flows.
Phase 4: Control Sequence & Integration Testing
Verification of all automatic sequences (start/stop, duty/standby, VFD response, alarm functions).
Integration testing with Building Management System (BMS) for monitoring and control points.
Calibration of field instruments (pressure transmitters, flow meters).
Phase 5: Training, Documentation & Certified Handover
Hands-on operational training for facility management staff.
Comprehensive Commissioning Report including all test data, certificates, and as-built settings.
Certificate of Commissioning for formal system acceptance and project closeout.
Why Compliant Commissioning is Non-Negotiable:
Risk Mitigation: Identifies defects before they cause operational failure or damage.
Energy Performance Assurance: Validates efficiency, preventing lifelong energy waste.
Regulatory & Warranty Compliance: Essential documentation for CCC (Certificate of Completion and Compliance), BOMBA approval (fire pumps), and manufacturer warranties.
Green Building Certification: Provides required evidence for GBI, LEED, GreenRE submissions.
Owner Assurance: Delivers a system that performs as intended from day one.
The EKG Commissioning Advantage:
Independent Third-Party Validation: We act as the owner's representative.
Certified Commissioning Agents: Using calibrated equipment and following international protocols.
Local Code Expertise: Knowledge of UBBL, Suruhanjaya Tenaga, DBKL requirements.
Don't accept performance on faith—validate it with certified compliance.
Professional commissioning is the critical final step that turns installed equipment into a reliable, code-compliant asset.
Contact EKG Malaysia to schedule MEP compliant water pump commissioning. We ensure your systems are delivered with certified performance and complete documentation for handover.