Cooling Tower Heat Rejection Capacity Audit

Cooling Tower Heat Rejection Capacity Audit

Category: Cooling Towers Ventilation Available
For more information, visit our official website at eakon.com.my

Description

Cooling Tower Heat Rejection Capacity Audit by EKG M&E Sdn Bhd

In the tropical climate of Kuala Lumpur and Selangor, where ambient wet-bulb temperatures are high and humidity is often near saturation, a cooling tower’s ability to reject heat is the bottleneck for your entire HVAC system. A Heat Rejection Capacity Audit is a formal M&E diagnostic to determine if your tower is meeting its design specifications or if it is "under-performing," causing your Chiller to consume excessive energy.

EKG M&E Sdn Bhd utilizes psychrometric data and high-precision flow instrumentation to quantify the "Approach" and "Range" of your heat rejection loop.


1. The Engineering Metrics of the Audit

As an HVAC and Clean Air Specialist, we don't just look at water temperature. We measure the thermodynamic efficiency of the evaporation process.

A. The "Approach" to Wet-Bulb

The most critical metric in a Malaysian warehouse or office tower is the Approach. This is the difference between the cold water temperature leaving the tower and the ambient wet-bulb temperature.

B. The "Range" (Thermal Delta T)

We measure the difference between the hot water entering the tower  and the cold water leaving.

C. L/G Ratio (Liquid-to-Gas)

We calculate the ratio of water flow (L) to airflow (G).


2. Physical Barriers to Capacity

During the audit, we inspect the mechanical assets that directly impact these thermal calculations:


3. Capacity Audit Performance Matrix

Metric Design Specification Audit Result (Typical Failing Tower) Impact on System
Approach 3 to 4 degree celcius 8 to 10 degree celcius Chiller trips on High Pressure.
Airflow (CMH) 100% Rated 75% (Belt Slip/Scale) Reduced Evaporation Rate.
Water Flow (LPM) Balanced Imbalanced (Nozzle Clogs) Uneven Heat Exchange.
Energy (kW/ton) 0.60 - 0.70 0.90+ Massive TNB Over-expenditure.

Why Choose EKG M&E Sdn Bhd?

More detail about EKG M & E SDN BHD
EKG M & E SDN BHD
EKG M & E SDN BHD ACMV Services Kuala Lumpur (KL), Fire Protection Services Selangor, Electrical Engineering Contractor Malaysia ~ EKG M & E SDN BHD
Contact Us flagMalaysia