AHU Duct Installation

分类: AHU Ducting & Terminal Connection Setup 当前有货
欲了解更多详情,请游览我们的官方网站 eakon.com.my

详情

AHU Ducting & Terminal Connection Setup: AHU Duct Installation

In the 2026 Malaysian engineering landscape, AHU Duct Installation is a highly regulated mechanical process. Under the Energy Efficiency and Conservation Act (EECA) 2024, ductwork is no longer viewed as mere sheet metal; it is an airtight pressure vessel that must meet strict leakage class and static pressure standards to minimize Building Energy Intensity (BEI).

At EKG (Malaysia) SDN BHD, our duct installations are engineered to be Sterile, Silent, and Statutory-Compliant, ensuring your facility passes the rigorous Suruhanjaya Tenaga (ST) and BOMBA audits.


1. The Statutory Framework: MS 1525 & SMACNA

The 2026 update to MS 1525:2024 mandates that all AHU ductwork must be installed to minimize friction and thermal loss, which are the primary drivers of excessive fan energy consumption.


2. Core Installation Components

A professional duct installation utilizes a multi-layered approach to airflow management.

Component Engineering Standard Purpose
Flexible Connection Double-Flanged Vinyl/Canvas Isolates fan vibration from the ductwork to maintain NC 30-35 acoustic levels.
Hanging & Support C-Channel / Threaded Rod Spaced every 2.4 to 3.0 meters to prevent duct sagging and airflow turbulence.
Transformation Pieces 15° to 30° Sloped Transitions Eliminates "System Effect" losses where duct sizes change.
Access Doors Gasketed & Insulated Allows for mandatory IAQ (Indoor Air Quality) inspections and coil cleaning.

3. Aerodynamic & Acoustic Integrity

To satisfy the requirements of Grade-A office spaces and critical facilities, the installation must prioritize "Laminar Flow."

  1. Radius-Guided Elbows: Every 90° turn in the main supply line is engineered with a radius or internal aerofoil turning vanes. This reduces the static pressure load on the VFD-driven fan, allowing it to run at lower, energy-saving RPMs.

  2. Sound Attenuator Integration: High-performance silencers are installed in the primary supply and return paths to absorb high-frequency "hiss" and motor hum, ensuring executive areas remain silent.

  3. VFD Harmonic Mitigation: Secure mounting and 360° EMC bonding of shielded cables are essential during installation to prevent the VFD’s switching frequencies from vibrating the ductwork.


4. The "Fire Mode" Statutory Protocol

Ductwork installation must comply with BOMBA (JBPM) 2026 fire compartmentation standards.


5. Why Partner with EKG (Malaysia) SDN BHD?

Is your AHU ducting setup causing energy waste or distracting noise? Contact EKG (Malaysia) SDN BHD today for a specialized Ducting & Statutory Compliance Audit.