BOMBA HVAC Standards

BOMBA HVAC Standards

分类: BOMBA Certified AHU Installation 当前有货
欲了解更多详情,请游览我们的官方网站 eakon.com.my

详情

BOMBA HVAC Standards: Statutory Safety Protocols 2026

In the 2026 Malaysian regulatory landscape, BOMBA HVAC Standards are the legal pillars governing the intersection of mechanical climate control and active fire protection. Regulated under the Fire Services Act 1988 (Act 341) and the Uniform Building By-Laws (UBBL) 2026, these standards ensure that HVAC systems—specifically Air Handling Units (AHUs)—do not facilitate the spread of fire or toxic smoke.

At EKG (Malaysia) SDN BHD, we engineer systems that satisfy these rigorous safety mandates while remaining Sterile, Silent, and Statutory-Compliant.


1. The AHU Safety Permit: Mandatory Documentation

As of February 3, 2026, obtaining an AHU Safety Permit is a non-negotiable step for any commercial or industrial installation. This permit is required for the building’s Fire Certificate (FC) renewal and the Certificate of Completion and Compliance (CCC).


2. Physical Engineering Standards

BOMBA standards specify how an HVAC system must physically interact with the building’s fire compartments.

A. Fire Compartmentation & Dampers

B. Smoke Detection & Control


3. Plant Room Layout & Access Standards

A BOMBA Approved Layout is essential for emergency response and maintenance audits.

Standard Category Requirement Engineering Purpose
Emergency Access 1000mm frontal clearance Allows fire officers to access the control panel and Fireman's Switch.
Service Clearance Unit Width + 300mm Ensures coils can be pulled for cleaning without obstructing exit paths.
Exit Route Unobstructed 900mm path Ensures safe egress for personnel during an alarm.
Fire Extinguishers CO2 / Dry Powder Must be mounted at 1.2m height near the AHU control panel.

4. Why Partner with EKG (Malaysia) SDN BHD?

Is your HVAC system compliant with the 2026 BOMBA Standards? Contact EKG (Malaysia) SDN BHD today for a specialized Statutory Safety Audit.

Are you applying for a safety permit for a new high-rise project or conducting a fire-safety upgrade for an existing facility?

更多 EKG M & E SDN BHD 相关资料
EKG M & E SDN BHD
EKG M & E SDN BHD ACMV Services Kuala Lumpur (KL), Fire Protection Services Selangor, Electrical Engineering Contractor Malaysia ~ EKG M & E SDN BHD