Automatic Fire Signal AHU Shut-off

Automatic Fire Signal AHU Shut-off

分类: BOMBA Certified AHU Installation 当前有货
欲了解更多详情,请游览我们的官方网站 eakon.com.my

详情

Automatic Fire Signal AHU Shut-off: Statutory Safety Standards 2026

In the 2026 Malaysian regulatory landscape, the Automatic Fire Signal AHU Shut-off is a non-negotiable life-safety requirement. Under the Fire Services Act 1988 (Act 341) and the Uniform Building By-Laws (UBBL) 2026, Air Handling Units (AHUs) are prohibited from operating during a fire event. This is to prevent the AHU from acting as a "smoke pump," which could distribute toxic fumes and heat throughout different fire compartments.

At EKG (Malaysia) SDN BHD, we integrate these shut-off protocols into every BOMBA Certified AHU Installation, ensuring your building remains Sterile, Silent, and Statutory-Compliant.


1. The Statutory Mandate (BOMBA & UBBL 2026)

As part of the AHU Safety Permit process, the fire signal integration must satisfy the following 2026 benchmarks:


2. Functional Sequence of Operation

When a fire signal is initiated, the BOMBA Certified Setup follows a strict millisecond-sequence:

  1. Signal Reception: The Fire Alarm Control Panel (FACP) sends a 24V DC signal to the AHU Control Panel.

  2. Motor Kill-Switch: The VSD immediately ramps down and cuts power to the IE5 EC Fan Wall.

  3. Damper Closure: Simultaneously, the Motorized Fire Dampers at the compartment walls receive a signal to close, creating a physical fire and smoke barrier.

  4. BMS Reporting: The system sends a "Confirmed Shutdown" status back to the Fire Control Room to inform emergency responders.


3. Engineering Hardware for Fire Integration

To maintain your AHU Safety Permit, the hardware used must be certified and auditable.

Hardware Component Requirement Purpose
Duct Smoke Detector Photoelectric / UL-Listed Reliable smoke detection in high-velocity air streams.
Fireman’s Switch Key-operated Manual Override Located at the Fire Control Room for manual fan control.
Fire-Rated (FR) Cabling MS 2116 Compliant Ensures the shut-off signal is not lost due to cable melting.
Motorized Dampers Spring-Return Fail-Safe Automatically closes the ducting if power is lost during a fire.

4. Why Partner with EKG (Malaysia) SDN BHD?

Is your AHU fire shut-off system legally compliant or a safety liability? Contact EKG (Malaysia) SDN BHD today for a specialized BOMBA Safety Audit & Integration.

Are you integrating this shut-off for a new high-rise development or as part of a fire safety upgrade for an existing commercial building?

更多 EKG M & E SDN BHD 相关资料
EKG M & E SDN BHD
EKG M & E SDN BHD ACMV Services Kuala Lumpur (KL), Fire Protection Services Selangor, Electrical Engineering Contractor Malaysia ~ EKG M & E SDN BHD