EVA Series

Gantry Structure Fully-auto Video Measuring Machine

Features

High Accuracy

≤ 2.2 + L/200µm

Less Error

Within 2µm

Auto Measurement

Fast Operation of Measurement

Auto-Focus

Reduce Time & Effort

Advance Software

EV Measuring

State-of-the-Art Structure

High precision optical grating ruler from the world’s top brand from Germany, Heidenhain with the accuracy of 0.001mm. High accuracy that comes with great stability.

High precision Grade 00 granite base and column, with stable expansion of the physical properties, to ensure high stability and accuracy.

Precision linear guide, grinding ball screw and full closed-loop servo motor to ensure smooth operation and precise positioning. The motor is noise-free during operation.

State-of-the-Art Structure
High Resolution Images and Intelligent Illumination

High Resolution Images and Intelligent Illumination

High definitive automatic continuous zoom lens and high resolution color digital camera, to ensure clear image without distortion.

With programmable 4-ring 8-division LED cold illumination and contour LED parallel illumination and internal intelligent light adjustment, it can automatic control the brightness of the light.

EV Measuring Software

EV Measuring Software

Professional Measuring Software

EV Measuring is a professional multisensor measuring software which combined with the developers years of experience in the measuring and software research industry. The design principle is friendly operation, powerful function, high accuracy and stability, simple maintenance.

  • Excellent software architecture design and fully objectoriented, to ensure the software is stable and reliable.
  • Professional SPC statistical analysis software connected to measuring software, to realize that the data could automatically export to SPC database without manual operation.
  • With powerful edge finder algorithm, which can help to get the edge of the shadow or dark image and ensure high accuracy
EV Measuring Software Interface
  • Support with multiple language, no need to install language pack and change the software which is convenient to local customers.
  • The same model of software will be permanent free to update, it can help to reduce other trouble to customer.
  • The software could automatically recognize and measure line, circle, arc and other elements.
EV Measuring Software Functions

Specifications

Model EVA-5040 EVA-6050 EVA-7060 EVA-8070 EVA-10080 EVA-120100 EVA-160120 EVA-180120 EVA-200150
X/Y-Axis Travel 500 x 400mm 600 x 500mm 700 x 600mm 800 x 700mm 1000 x 800mm 1200 x 1000mm 1600 x 1200mm 1800 x 1200mm 2000 x 1500mm
Glass Table 560 x 460mm 660 x 560mm 760 x 660mm 860 x 760mm 1060 x 860mm 1260 x 1060mm 1760 x 1360mm 2060 x 1560mm 2700 x 1560mm
Workbench 660 x 560mm 760 x 660mm 860 x 760mm 960 x 860mm 1160 x 960mm 1360 x 1160mm 1860 x 1460mm 2160 x 1760mm 2860 x 1660mm
Dimension (W x D x H) 1150 x 910 x
1920mm
1350 x 1110 x
1920mm
1550 x 1310 x
1920mm
1750 x 1510 x
1920mm
1950 x 1810 x
1920mm
2150 x 1910 x
1920mm
2350 x 2110 x
1920mm
2350 x 2310 x
1920mm
3000 x 2510 x
1920mm
Load Capacity 50kg 50kg 50kg 50kg 50kg 50kg 50kg 50kg 50kg
Net Weight 500kg 650kg 750kg 850kg 1050kg 1250kg 1450kg 1650kg 2000kg
Z-axis Travel High Precision Linear Guide, working travel 200mm
X/Y/Z-Axis Resolution 0.001mm;   Optional 0.0001mm
X/Y-Axis Accuracy X/Y-Axis Accuracy: ≤ 2.2 + L/200 (µm); Z-Axis Accuracy: ≤ 4 + L/50 (µm) [L= Length (mm)]
Repeatability 2µm
Main Structure High Stability Grade 00 Granite
Grating Structure Heidenhain (GERMANY) RSF high precision grating scale, with the accuracy of 0.001mm
Motor Three-axis Servo Motor; Optional: Joystick
Illumination System (Programmable) Surface: Stepless Adjustable 4-ring 8-division LED Cold Illumination
Contour: LED Parallel Illumination
CCD High Resolution 520TV Color CCD Camera (SONY Sensor)
Motorized Zoom Lens MT High Resolution Automatic Zoom Stereo Lens
Magnification: 0.7X ~ 4.5X;  Video Magnification: 30X ~ 225X
Working Distance 90mm
Field-of-View 10.6 – 1.6mm;   Optional Lens 0.5X & 2X
Measuring Software EV Measuring
Power Supply 220V ±10% (AC) 50Hz

Specifications are subject to change without prior notice.

Optional Accessories

Touch Probe

Touch Probe

After the equipment is installed with probe, it can be used to measure the following parameters:

  • Height, width, length
  • The angle between the two sides
  • Vertical angle of cone
  • Diameter of cylinder
  • Chamfer
  • Straightness, flatness, roundness, cylindricity
  • Verticality, parallelism, inclination, and so on.

Coaxial Light Source

Coaxial Light Source with Different Effect

Coaxial Light Effect

Coaxial Light Source with Different Effect

Joystick

Optional joystick control accessory.

Part Accessories

4-ring 8-division LED Cold Illumination

Calibration Block

Rotary Fixture

V-Block

Calibration Glass Stage

Data Integration Box

Software Dongle

Part Accessory

Contact us today to inquire about the EVA Series and enhance your video measuring capabilities.

更多 MSP Metrology (M) Sdn Bhd 相关资料
MSP Metrology (M) Sdn Bhd
MSP Metrology (M) Sdn Bhd Precision Measuring Equipment Supplier in Malaysia & Singapore | Metrology & Material Testing Supply JB, KL & Penang - MSP Metrology (M) Sdn Bhd