Forged and heat treated load hooks with batch trace ability and stretch indicators
Idling Operation
1. Depress the retaining pawl all the way and pull the grip ring towards you
2. The chain can be adjusted up and down by hand.
3. To terminate the idling: Set the change lever in the down () position. (See diagram as below). Then, depressing the retaining pawl as far as possible, push the grip ring gently so as to let the pawl engage the outer edge of the retaining plate. Next, grip the grip ring and handle with a single hand and push them while turning
them counter-clockwise. the retaining pawl returns to its original position.