In the high-rise office towers and retail hubs of KL and PJ, smoke control is the most critical life-safety element of the building's M&E infrastructure. EKG M&E Sdn Bhd specializes in Commercial Smoke Control, engineering integrated systems that manage the movement of toxic gases to protect occupants and provide clear access for emergency responders. Our designs are fully compliant with the Uniform Building By-Laws (UBBL) and BOMBA standards.
A commercial facility requires a "Zoned" approach to smoke management. We ensure that smoke produced in one area (e.g., a pantry or a retail lot) does not infiltrate the rest of the building.
Mechanical Smoke Spill Extraction (10 ACH)
Upon fire detection, our high-capacity axial fans activate to "flush" the affected zone. We engineer these systems to provide a minimum of 10 Air Changes Per Hour (ACH), rapidly removing heat and smoke to maintain visibility at the floor level.
Motorized Smoke and Fire Dampers
To prevent the HVAC ductwork from acting as a "highway" for smoke, we install motorized dampers at every fire-rated wall penetration. These are interlocked with the fire alarm system to snap shut instantly, isolating the fire zone.
Stairwell and Lift Lobby Pressurization
To keep escape routes 100% smoke-free, we utilize Positive Pressure. We install dedicated fans that pump fresh air into stairwells at a pressure of 50 Pa. This ensures that when a fire door is opened, air blows out, pushing smoke away from the fleeing occupants.
Replacement (Make-Up) Air Logic
For every cubic meter of smoke extracted, we must supply a cubic meter of fresh air. We utilize motorized louvers or dedicated fresh air fans to prevent the building from becoming "negative-pressured," which would make exit doors physically impossible to open.
VFD-Driven Emergency Mode
While we use Variable Frequency Drives (VFDs) for daily ventilation energy savings, the system features a "Fire Mode" override. This bypasses all motor protection and energy limits to run fans at 100% capacity immediately upon a fire signal.
| System Feature | UBBL / BOMBA Requirement | EKG M&E Standard |
| Fan Rating | 250 degrees C for 2 hours. | High-temperature H-Class motors. |
| Response Time | Full operation within 60 seconds. | High-torque motorized actuators. |
| Power Supply | Essential/Genset backed. | Fire-rated cables and ATS integration. |
| Manual Control | Fireman's Override Switch. | Centralized Fire Command Center logic. |
HVAC & Clean Air Specialist: We ensure your smoke control system doesn't conflict with your "Clean Air" goals. We design the layout to ensure that exhausted smoke is never accidentally "re-entrained" (sucked back in) through the fresh air intakes of other floors.
Testing and Commissioning (T&C): We provide professional Smoke Visualization Testing and Pressure Mapping to prove your system works before your annual fire certificate audit.
Klang Valley Strategic Support: Based in Kuala Lumpur, we provide priority maintenance for smoke fans, dampers, and sensors for Grade-A commercial towers across the Klang Valley.