In the enclosed basements of KL and PJ, the ductwork is the "lifeline" of the smoke extraction system. During a vehicle fire, these ducts must transport superheated gases and smoke (250 to 400 degree celcius) out of the building without collapsing or leaking. EKG M & E Sdn Bhd specializes in the installation and certification of Fire Rated Car Park Ductwork, ensuring your project meets the stringent Uniform Building By-Laws (UBBL) and BOMBA requirements.
2-Hour & 4-Hour Stability & Integrity
We install duct systems tested to international standards (such as BS 476 Part 24 or EN 1366-1/8). These ducts are engineered to maintain their structural shape (Stability) and prevent the passage of flames or hot gases (Integrity) for up to 4 hours.
Specialized Fire Wrap & Boarding
For standard galvanized steel ducts, we provide professional encasement using high-density Rockwool mats, calcium silicate boards, or specialized ceramic fiber wraps. This ensures zero-clearance to combustible materials and protects nearby M&E services from radiant heat.
Pre-Fabricated Self-Supporting Fire Ducts
To save ceiling space and installation time, we offer pre-fabricated fire ducts made from specialized composite materials. These are lighter than traditional boarded ducts and do not require a separate steel inner liner.
High-Temperature Gaskets & Sealants
Standard HVAC sealants fail in minutes during a fire. We use intumescent gaskets and fire-stop sealants at all joints and wall penetrations. These materials expand when heated, creating a liquid-tight, smoke-proof seal.
Internal Reinforcement for High Suction
Smoke spill fans create massive negative pressure. We reinforce the internal structure of the ductwork to prevent "implosion" or "oil-canning" when the system kicks into its maximum emergency extraction mode.
Motorized Smoke & Fire Damper Integration
Where ducts pass through fire compartments (e.g., from the car park into a vertical shaft), we install motorized dampers. These are interlocked with the Fire Alarm Monitoring System (FAMS) to prevent smoke from migrating to upper floors.
BOMBA-Compliant Hangers & Supports
A fire-rated duct is only as good as its support system. We use heavy-duty threaded rods and unistrut trapeze hangers that are specifically sized to account for the thermal expansion and weight of the ducting during a fire.
BOMBA Certification Support
We provide the necessary material catalogs, test reports, and installation certificates (Form G) required by BOMBA for your building's Fire Certificate (FC) and CCC application.
Engineering for Thermal Expansion
As an M&E firm, we calculate the linear expansion of the steel at high temperatures (250 degree celcius). We design the routing with appropriate "swing joints" or expansion bellows to prevent the duct from buckling or tearing away from its wall mounts.
Strategic Support in KL & PJ
We have extensive experience retrofitting fire-rated ductwork in the tight basement voids of Kuala Lumpur and Petaling Jaya, ensuring compliance without compromising vehicle height clearances.
Malaysia