EKG M&E Sdn Bhd is a premier mechanical and electrical (M&E) specialist in Malaysia, delivering advanced air conditioning, industrial chiller plant engineering, cooling tower installations, and precise cooling tower make-up water sizing specifications for commercial facilities.
1. Cooling Tower Make-Up Water Sizing & Demand Calculation
Why 1: Engineers accurate make-up water requirements by factoring in precise evaporation losses, drift loss, and blowdown rates based on circulating flow.
Why 2: Ensures continuous water basin level stability and prevents scaling or water starvation in central chiller plant networks.
2. Cycles of Concentration & Blowdown Optimization
Why 1: Optimizes cycles of concentration (COC) to balance water conservation against mineral scale accumulation and chemical treatment costs.
Why 2: Reduces wastewater discharge volume and protects condenser tubes from premature scaling and fouling degradation.
3. Certified Engineering Compliance & Full-Lifecycle Execution
Why 1: Backed by experienced M&E professionals adhering strictly to local regulatory frameworks, water management guidelines, and Green Building Index (GBI) standards.
Why 2: Delivers comprehensive end-to-end execution from flow rate calculations and pipe sizing to automated valve integration and commissioning.
Malaysia