Collaborative BIM Workflow for ACMV

Collaborative BIM Workflow for ACMV

Kategori: BIM-Coordinated AHU System Design Tersedia
Untuk maklumat lanjut, lawati laman web rasmi kami di eakon.com.my

Penerangan

Collaborative BIM Workflow for ACMV by EKG (Malaysia) SDN BHD

In the 2026 landscape of the Energy Efficiency and Conservation Act (EECA) 2024, a successful ACMV (Air Conditioning and Mechanical Ventilation) project is no longer the result of isolated engineering. It is the product of a Collaborative BIM Workflow. With the July 1, 2025 mandate requiring BIM for all projects above RM10 million (Pekeliling Perbendaharaan PK 1.15), the ability to work within a unified digital environment is now a statutory necessity.

 

At EKG (Malaysia) SDN BHD, we utilize an ISO 19650-compliant workflow to ensure that architectural, structural, and mechanical teams operate as a single, data-driven unit.


1. The Common Data Environment (CDE)

The foundation of collaboration is the CDE (typically Autodesk Construction Cloud or similar). This serves as the "Single Source of Truth" where all stakeholders access the latest models and data.

 


2. Multi-Disciplinary Coordination Lifecycle

A collaborative workflow is a cycle of continuous refinement, ensuring that the ACMV system—including Total Enthalpy Recovery Wheels and IE5 Fan Walls—is physically and thermally coordinated.

Stage Collaboration Activity Engineering Output
Concept Linking the Architect’s massing model. Early Cooling Load Estimation and plant room sizing.
Design Soft Clash Detection against structural beams. Optimization of duct routes to maintain SFP < 1.1 kW/m³/s.
Coordination Weekly "Clash-Free" model reviews. Resolution of mechanical-electrical-plumbing (MEP) conflicts.
Fabrication Exporting LOD 400 data for off-site spooling. High-precision duct and pipe fabrication with zero site waste.
Handover Exporting COBie data to the client's CMMS. A "Digital Twin" ready for EECA 2024 energy monitoring.

3. Integrated Green Building Assessment (GBI/LEED)

In 2026, collaborative BIM is the primary tool for securing GBI (Green Building Index) or LEED certification.


4. Technical Quality Control (ISO 19650)

At EKG, our collaborative workflow is governed by strict technical standards to ensure data integrity.


5. Why Partner with EKG (Malaysia) SDN BHD?

Is your ACMV project being designed in a silo or a synchronized digital ecosystem? Contact EKG (Malaysia) SDN BHD today. We specialize in Collaborative BIM Workflows for the 2026 environment.

Lebih maklumat tentang EKG M & E SDN BHD
EKG M & E SDN BHD
EKG M & E SDN BHD ACMV Services Kuala Lumpur (KL), Fire Protection Services Selangor, Electrical Engineering Contractor Malaysia ~ EKG M & E SDN BHD