A Boiler or Domestic Booster Pump is a high-pressure component that serves as the backbone of a building’s water distribution. Incorrect installation doesn't just lead to low water pressure; it can cause catastrophic "water hammer" that bursts pipes, electrical shorts in the control panel, and premature motor failure.
EKG (Malaysia) Sdn Bhd provides turnkey installation services, ensuring your booster system is mechanically aligned, electrically safe, and hydraulically balanced for long-term reliability.
Before a single pipe is cut, our engineers verify the building's Total Dynamic Head (TDH) and Peak Flow Demand. This ensures the pump we install is perfectly matched to your building’s height and occupancy levels. An oversized pump is a waste of energy, while an undersized one will result in "no-water" complaints from the top floors.
For industrial and high-rise booster sets, we install a reinforced Inertia Base or vibration-damping pads. This prevents the mechanical "thump" of the pump from traveling through the building's concrete structure and disturbing tenants.
We utilize specialized fittings to protect your investment:
Flexible Connectors: To absorb thermal expansion and vibration.
Suction Diffusers: To ensure smooth, non-turbulent water flow into the pump impeller.
Check Valves (Non-Return): To prevent backflow that causes "water hammer" when the pump shuts off.
The modern standard is the Variable Frequency Drive (VFD). We handle the wiring of the control panel and the placement of pressure transducers. This allows the pump to "soft-start" and modulate its speed based on real-time demand, protecting your motor and slashing electricity costs.
To ensure a "Zero-Failure" handover, EKG technicians follow a strict ISO-certified checklist:
Laser Shaft Alignment: Ensuring the motor and pump are perfectly synchronized to prevent seal leaks.
Pressure Tank Pre-Charge: Setting the correct air pressure in the accumulator tank to prevent pump "cycling."
Dry-Run Protection Testing: Verifying that the pump will automatically shut down if the water supply is cut off, preventing the motor from burning out.
BMS Interfacing: Connecting the system to your Building Management System via Modbus or BACnet for remote monitoring.
Turnkey MEP Capability: We manage the plumbing, electrical, and mechanical aspects as one unified project.
Rapid Deployment in Selangor: We understand that water is a vital utility. Our team provides fast, efficient installations across the Klang Valley to minimize downtime.
Energy-Focused Engineering: Our VFD-driven installations typically pay for themselves within 18 months through reduced utility bills.
Don't risk your facility's infrastructure with a "pipe-fit only" installation. Trust the technical experts at EKG (Malaysia) Sdn Bhd to install a booster system that is powerful, silent, and efficient.
Are you planning a new installation or a system upgrade? Contact us now for a free site assessment and a technical quote on our professional booster pump installation services!
Lebih maklumat tentang EKG M & E SDN. BHD.
Malaysia