Data Center Solutions and Cable Management. Best solution for cable work, protection and easy installation. No excavation required for extra cables or repairs. Cost savings: 7% for initial work, 48% for maintenance work. It is made from PE material with length up to 50m and weight 2kg/m. It has execellent compression strength, shock resistance, corrossion resistance, joint water-tightness, joint strength, workability and avaibility for curved installation. It features with less jointing work, good workability with weight, length and flexibility, moreover it is top runner for 50 years.
Lebih maklumat tentang Superflex Engineering
Malaysia