ERV System Design

分类: Energy Recovery Ventilation (ERV) Design 当前有货
欲了解更多详情,请游览我们的官方网站 eakon.com.my

详情

ERV System Design by EKG M&E Sdn Bhd

In the 2026 landscape of the Energy Efficiency and Conservation Act (EECA) 2024, professional ERV System Design is the essential foundation for any high-performance building in Malaysia. Designing an Energy Recovery Ventilation (ERV) system goes beyond simply selecting a unit; it requires a deep understanding of psychrometrics, building pressure regimes, and airflow dynamics to ensure the system delivers a tangible reduction in Building Energy Intensity (BEI).

At EKG (Malaysia) SDN BHD, our design philosophy focuses on creating sterile, silent, and ultra-efficient ventilation networks that are fully compliant with the latest statutory energy mandates.


1. The Core Design Framework

A robust ERV system design is built upon three primary engineering pillars:


2. Technical Design Specifications (2026 Standards)

To pass 2026 statutory energy audits, an EKG-designed system incorporates high-tier components and configurations:

Design Feature Specification Target Purpose
Fan Drive IE5 Direct-Drive EC Fan Walls Maximize electrical efficiency and allow for precise airflow modulation.
Specific Fan Power < 0.9 kW/m3/s Stay well below the legal limit of 1.1 kW/m3/s for EECA compliance.
Airtightness L1 Leakage Class Eliminate air bypass to ensure 100% of energy is recovered within the core.
Media Hygiene Antimicrobial Silver-Ion Coating Prevent bio-film and mold growth in high-humidity exchange zones.
Controls Demand Control Ventilation (DCV) Integrate CO2 and TVOC sensors to ramp ventilation based on occupancy.

3. Psychrometric Optimization

Our design process utilizes advanced psychrometric modeling to calculate the exact "coolth" reclaimed. In a typical KL environment:

  1. Outdoor Air (OA): Enters the system at 33 degrees Celsius and 80% RH.

  2. Return Air (RA): Exhausted from the building at 24 degrees Celsius and 50% RH.

  3. The Exchange: The ERV core transfers energy, allowing the Supply Air (SA) to enter the building at approximately 26 degrees Celsius and 60% RH.

  4. The Result: This "free" pre-conditioning reduces the total cooling load on your central chiller plant by up to 20-30%.


4. 2026 Statutory and Safety Compliance

Every EKG ERV design is engineered to meet the most rigorous Malaysian and international standards:


5. Why Partner with EKG (Malaysia) SDN BHD?

Is your building's ventilation designed for the 2026 energy landscape? Contact EKG (Malaysia) SDN BHD today. We specialize in engineering ERV System Designs that are sterile, silent, and ultra-efficient.

更多 EKG M & E SDN BHD 相关资料
EKG M & E SDN BHD
EKG M & E SDN BHD ACMV Services Kuala Lumpur (KL), Fire Protection Services Selangor, Electrical Engineering Contractor Malaysia ~ EKG M & E SDN BHD