In the 2026 Malaysian regulatory landscape, an Approved AHU Setup is a configuration that has successfully passed the intersection of three major statutory bodies: DOSH (JKKP) for hygiene and safety, the Energy Commission (ST) for EECA 2024 efficiency, and BOMBA for fire life safety. Since the full enforcement of the Energy Efficiency and Conservation Act (EECA) on January 1, 2025, an unapproved setup is a legal liability that can prevent a building from obtaining its Energy Intensity Label.
At EKG (Malaysia) SDN BHD, we deliver "Turnkey Approved" setups that ensure your assets are Sterile, Silent, and Statutory-Compliant.
To be classified as an "Approved Setup," the installation must satisfy these specific 2026 benchmarks:
EECA 2024 (Energy Commission): The unit must demonstrate a Specific Fan Power (SFP) < 1.1 kW/m³/s. This requires the use of high-efficiency IE5 EC Fan Walls and low-pressure-drop filtration.
JKKP/DOSH (Hygiene & Safety): The setup must facilitate Sterile Drainage via a mandatory 1:100 slope and a high-deflection isolation system to prevent structural vibration.
BOMBA (Fire Safety): The installation must hold a valid AHU Safety Permit, featuring integrated smoke detectors and automatic shutdown protocols linked to the Fire Alarm Monitoring System (FAMS).
An approved configuration is engineered to eliminate "System Effect" losses and maintenance hurdles.
| Component | Engineering Requirement | Statutory Purpose |
| Casing | TB2 Thermal Break / Class L1 Leakage | Prevents "Energy Theft" and external condensation (mold). |
| Fan System | IE5 EC Fan Wall (Direct Drive) | Meets the mandatory 2026 energy efficiency targets. |
| Filtration | MERV 14 (High Capacity) | Complies with JKKP indoor air quality (IAQ) standards. |
| Plinth/Mounting | 300mm Height + Spring Isolators | Ensures NC 30-35 acoustic profile and sterile drainage. |
An "Approved Setup" is defined by its accessibility. Under the updated MS 1525:2024, a unit that cannot be audited is non-compliant.
Maintenance Clearance Zones: Every setup must maintain a clearance of Unit Width + 300mm on the service side to allow for full coil pull-out and deep cleaning.
Integrated Monitoring: The setup must include Modbus/BACnet sensors that feed real-time power and airflow data to the building’s Energy Management System (EMS). This data is required for the mandatory 5-year periodic energy audit.
Digital Twin (LOD 500): We scan the final approved setup and upload the coordinates and performance benchmarks to your building’s Digital Birth Certificate.
Technical Integrity: Our setups are designed by mechanical engineers who specialize in the thermodynamics and statutory requirements of the 2026 Malaysian market.
Regulatory Management: We handle all submissions for the BOMBA Safety Permit and provide the documented proof required for JKKP and ST compliance.
GITA Support: Our "Approved Setup" documentation is essential for claiming the 100% Green Investment Tax Allowance on high-performance HVAC equipment.
Is your AHU setup a performance asset or a statutory risk? Contact EKG (Malaysia) SDN BHD today for a specialized Approved AHU Setup & Audit.
Are you looking for an approved setup for a new Grade-A office development or an efficiency-driven retrofit for an existing facility?
More detail about EKG M & E SDN BHD
Malaysia