AHU Ducting & Terminal Connection Setup: AC Ducting Setup

In the 2026 Malaysian engineering landscape, the AC Ducting Setup for an AHU is the critical "highway" that determines both the energy efficiency and the acoustic comfort of a facility. Governed by MS 1525:2024 and the Energy Efficiency and Conservation Act (EECA) 2024, modern ducting must be engineered to minimize "System Effect" losses, ensuring the AHU meets its statutory Specific Fan Power (SFP) targets.

At EKG (Malaysia) SDN BHD, we design ducting systems to be Sterile, Silent, and Statutory-Compliant, bridging the gap between high-velocity airflow and quiet indoor environments.


1. The Statutory Framework: MS 1525 & SMACNA

Under the 2026 update to MS 1525, duct leakage and static pressure management are mandatory audit points for a building's Energy Management System (EnMS).


2. Core Components of the AHU Connection

The connection between the AHU and the main ductwork is where most aerodynamic and acoustic issues originate.

Component Engineering Standard Purpose
Flexible Connection Double-Flanged Canvas/Vinyl Isolates the AHU's mechanical vibration from the ductwork to meet NC 30-35 standards.
Plenum Box Internal Acoustic Lining Acts as a "muffler" to stabilize airflow velocity before it enters the main branch.
Bell-Mouth Entry Aerodynamic Radius Reduces entry turbulence and "System Effect," lowering the VFD power consumption.
Volume Control Damper (VCD) Opposed-Blade / Aerofoil Allows for precise air balancing across different floors or zones.

3. Aerodynamic Optimization & SFP

To satisfy the EECA 2024 mandate of keeping SFP below 1.6 kW/m³/s, the ducting setup must prioritize smooth transitions:

  1. Aspect Ratio: We maintain a preferred duct aspect ratio of 1:1 to 3:1. Excessive "flat" ducts (e.g., 8:1) significantly increase friction and fan energy waste.

  2. Turning Vanes: Every 90° elbow in the main supply line is fitted with aerofoil turning vanes to prevent "Air Hammer" and pressure drops.

  3. Static Regain Design: For long horizontal runs, we utilize static regain calculations to ensure that terminal VAV boxes receive consistent pressure regardless of their distance from the AHU.


4. The "Fire Mode" Statutory Protocol

The ducting setup is the primary path for smoke travel during an emergency. Under BOMBA (JBPM) 2026 regulations, specific "Terminal Connections" are mandatory:


5. Why Partner with EKG (Malaysia) SDN BHD?

Is your ducting setup a source of noise and energy waste? Contact EKG (Malaysia) SDN BHD today for a specialized Ducting & Static Pressure Audit.