In the 2026 Malaysian regulatory landscape, BOMBA HVAC Standards are the legal pillars governing the intersection of mechanical climate control and active fire protection. Regulated under the Fire Services Act 1988 (Act 341) and the Uniform Building By-Laws (UBBL) 2026, these standards ensure that HVAC systems—specifically Air Handling Units (AHUs)—do not facilitate the spread of fire or toxic smoke.
At EKG (Malaysia) SDN BHD, we engineer systems that satisfy these rigorous safety mandates while remaining Sterile, Silent, and Statutory-Compliant.
As of February 3, 2026, obtaining an AHU Safety Permit is a non-negotiable step for any commercial or industrial installation. This permit is required for the building’s Fire Certificate (FC) renewal and the Certificate of Completion and Compliance (CCC).
Integration with FAMS: Every AHU serving a compartment larger than 92.9 square meters (1,000 sq. ft.) must be interlocked with the Fire Alarm Monitoring System (FAMS).
Automatic Shut-off: The system must be programmed with a "Fail-Safe" logic. Upon a fire signal, the IE5 EC Fan Walls must shut down immediately to stop the recirculation of smoke.
BOMBA "K" Mark: All fire-safety components, including sensors and dampers, must carry a valid BOMBA "K" Mark or be registered in the eFEIS 2.0 digital system.
BOMBA standards specify how an HVAC system must physically interact with the building’s fire compartments.
Motorized Fire Dampers: Installed where ductwork penetrates fire-rated walls. These must be MS 558 certified and capable of sealing the duct in under 20 seconds.
Passive Fire-Stopping: All gaps between ductwork and structural openings must be sealed with BOMBA-approved intumescent fire-stop mortar or mastic to maintain a 2-hour fire rating.
Duct Smoke Detectors: Photoelectric sensors must be placed in the return air plenum. These trigger a localized Automatic Fire Signal AHU Shut-off if smoke is detected within the air stream itself.
Fire-Rated (FR) Cabling: All control wiring for fire shut-off signals must use MS 2116 compliant cabling to ensure the signal is not lost during a high-heat event.
A BOMBA Approved Layout is essential for emergency response and maintenance audits.
| Standard Category | Requirement | Engineering Purpose |
| Emergency Access | 1000mm frontal clearance | Allows fire officers to access the control panel and Fireman's Switch. |
| Service Clearance | Unit Width + 300mm | Ensures coils can be pulled for cleaning without obstructing exit paths. |
| Exit Route | Unobstructed 900mm path | Ensures safe egress for personnel during an alarm. |
| Fire Extinguishers | CO2 / Dry Powder | Must be mounted at 1.2m height near the AHU control panel. |
Technical Integrity: Our installations are overseen by mechanical engineers who specialize in the complex relationship between HVAC thermodynamics and fire-life safety.
Submission Management: We handle the entire BOMBA Form B and G8/G9 documentation process to ensure your permit is issued without project delays.
EECA 2024 Alignment: We ensure that BOMBA safety components (like low-pressure-drop dampers) do not compromise your unit's Specific Fan Power (SFP) energy rating.
Is your HVAC system compliant with the 2026 BOMBA Standards? Contact EKG (Malaysia) SDN BHD today for a specialized Statutory Safety Audit.
Are you applying for a safety permit for a new high-rise project or conducting a fire-safety upgrade for an existing facility?
More detail about EKG M & E SDN BHD
Malaysia