In the dense urban corridors of Kuala Lumpur and Selangor, the primary threat to life during a building fire is not the flames, but the accumulation of toxic, superheated smoke. Smoke Extraction Ducting (also known as Smoke Spill Ducting) is a specialized mechanical network designed to remove these gases, maintain visibility, and keep temperatures at a level that allows for safe evacuation. EKG M&E Sdn Bhd provides high-performance installations that strictly adhere to BOMBA requirements, MS 1780, and the Uniform Building By-Laws (UBBL).
Standard ventilation ducts fail quickly in a fire. Smoke extraction systems must be "Integrity-Tested" to remain operational while transporting gases at temperatures exceeding 250°C to 400°C.
Under Malaysian law, any non-fire compartmented occupancy exceeding 1,000 square meters above ground, or any basement compartment regardless of size, must be provided with a powered smoke spill system.
Fire Resistance Level (FRL): Our systems are certified for 120/120/120 (2 hours). This covers Stability (no collapse), Integrity (no smoke leaks), and Insulation (no heat transfer to nearby materials).
High-Temperature Fans: We install high-static Axial Fans equipped with Class H motors, certified to run at 250°C for 120 minutes.
Sheet Metal with Fire-Rated Coating: Conventionally, we use heavy-gauge G.I. ducting (typically 1.2 mm thick for fire compartments) coated with a certified 2-hour fire-rated paint.
Pre-Fabricated Board Systems: In high-risk areas, we utilize self-supporting calcium silicate or vermiculite board ducts that offer inherent insulation and zero-clearance to walls.
Zero-Fire-Damper Logic: Unlike standard HVAC, fire dampers must not be installed in smoke extraction ducts, as they would block the extraction of smoke during an emergency.
As a BOMBA-Compliant M&E Specialist, EKG ensures your smoke control infrastructure supports building efficiency:
TNB Energy Efficiency (Dual-Purpose Logic): Many smoke spill systems serve as daily general ventilation (e.g., removing CO from car parks). By ensuring the system is Class C Airtight, we eliminate air leakage. This allows your Variable Frequency Drive (VFD) to maintain required airflows at lower frequencies (Hz) during normal hours, directly resulting in a lower monthly TNB electricity bill.
EECA 2024 & Building Compliance: Under the Energy Efficiency and Conservation Act (EECA) 2024, efficient mechanical transport is a core requirement. Our precision-sealed fire ducts prevent the waste of conditioned air, helping lower your Building Energy Index (BEI).
BOMBA Verification (The 6-Minute Rule): A properly engineered SES ensures that once triggered, the smoke layer is kept high enough that BOMBA personnel can see the "EXIT" signs in lobbies and staircases within 6 minutes of arrival.
| Feature | Standard Ventilation Ducting | EKG Smoke Extraction Ducting |
| Material Thickness | 0.5 mm – 0.8 mm | 1.2 mm (BOMBA Standard) |
| Temperature Limit | < 200°C (Fails) | 250°C to 400°C (2+ Hours) |
| Fire Damper | Installed at Compartments | Banned (Blocks Extraction) |
| Sealing System | Standard Mastic | Certified Intumescent Sealant |
| BOMBA Required | No | Mandatory (>1,000 m² or Basements) |
Total 3D BIM Coordination: We utilize 3D modeling to route heavy fire-rated ducts through crowded ceiling spaces, ensuring zero "clashes" with sprinklers or structural beams while maintaining necessary maintenance access.
Turnkey BOMBA Submission: We assist in the preparation of technical drawings and perform mandatory Smoke Tests, Airflow Balancing, and Anemometer Traverse tests required for Fire Certificate (FC) applications.
Strategic Regional Support: Based in Kuala Lumpur, we provide professional SES services for shopping malls, data centers, hospitals, and high-rise office towers across Malaysia.
Is your facility’s smoke spill system ready to protect lives during an emergency? Contact EKG M&E Sdn Bhd today for a professional smoke extraction ducting audit and technical proposal.
More detail about EKG M & E SDN BHD
Malaysia