| TEST | REQUIREMENTS | RESULTS | 
| Gas Leak Test | Gn2 Nitrogen 1,000 PSI for 10 minutes | No leakage | 
| Hydrostatic Burst | Based on 4 x Operating Pressure held for 5 minutes | No leakage | 
| Hydrostatic Proof | Based on 1.5 x Operating Pressure held for 5 minutes | No leakage | 
| Vibration Test | 20,000,000 cycles at displacement @ operating pressure | Passed | 
| Impulse Test | 500,000 cycles @ 1.33 x Operating Pressure based on ISO/BS Impulse Cycle | Passed | 
| Impulse/Flexure and Fatigue at Low Temperature | Simultaneous impulse and bending stress, 8 times during test of 10,000 cycles each under peak pressure and rated bending each fitting was subjected to -100 deg F for one hour utilizing liquid CO2. | No leakage | 
| Tensile Test | Fitting was installed in tensile machine with cross head speed of 0.20 in/min and pulled until one side of pipe dismembered from the fitting/pipe joint | Exceeded Tensile Strength by a factor of 1.33 to 1.63 | 
| Torsion Test | At various Torsion Angles and Ft-Lbs of Torque @4500 Psig (Gn2) and 6000 Psig (Hydraulic Fluid) | No Leakage | 
| Heat Aging | Maintained at 400 deg F ± 5 deg F for 168 hours, Proof test @ 6000 Psig for 30 minutes | Passed | 



| CNG – Compressed Natural Gas | Hydraulic Oil | 
| Paint and Sealer Lines | Low Temperature Steam | 
| Condensate Piping | LPG – Liquefied Petroleum Gas | 
| Deluge Systems | Lubrication and Grease | 
| Down Well Coiled Tubing | Natural Gas | 
| Drains and Plumbing Vents | Waste Water | 
| Ethylene Glycol/Water | RAD Waste Systems | 
| Fuel Oil and Fuel Gas | Solvents and Water Based Paints | 
| Gases – Nitrogen, Air, Helium | Subsea Piping | 
| Heating Coil | Steam Tracer Lines | 
| 
					High Pressure Water Mist/Fog – Fire Suppression Systems  | 
				
					Plant Instrumentation and Utility Air  | 
			



        More detail about Canglobal Fluid Power Sdn Bhd
    