In the 2026 Malaysian engineering landscape, the interface between Fire Rated Ducting and the Air Handling Unit (AHU) is a critical point of statutory audit. Under the Uniform Building By-Laws (UBBL) 2026 and MS 2586:2026, the continuity of a building's fire compartmentation must not be compromised by HVAC penetrations. As of February 3, 2026, BOMBA inspectors specifically target "Breakaway Connections" and "Fire-Rated Canvas" as high-fail items during Fire Certificate (FC) inspections.
At EKG (Malaysia) SDN BHD, we ensure your ducting systems are Sterile, Silent, and Statutory-Compliant.
Ductwork passing through different fire compartments must be "Fire Rated" or enclosed in a fire-rated shaft.
2-Hour Fire Integrity: All ducting crossing fire-rated walls must maintain a fire-resistance rating (integrity and insulation) equal to the wall itself—typically 120 minutes.
Smoke Spill vs. Standard AC: For smoke spill systems, fire dampers are forbidden (to ensure continuous smoke extraction), requiring the entire duct run to be fire-rated (e.g., via 1.2mm G18 sheet metal or specialized fire-rated coatings).
eFEIS 2.0 Compliance: Every fire-rated duct system and its associated dampers must be registered in the BOMBA digital system and carry the mandatory BOMBA "K" Mark.
The point where the rigid ducting meets the AHU must account for both vibration isolation and fire safety.
Standard dark green canvas is a major statutory violation in 2026.
Standard: Must be made of specialized Fire-Rated Canvas (typically grey or silicone-coated glass cloth) that can withstand temperatures of 250°C for 2 hours.
Purpose: Prevents the connector from melting and allowing smoke to leak into the plant room, which must remain a "Safe Fire Cell."
To protect the integrity of the Motorized Fire Dampers, the duct connection to the damper sleeve must be designed to "fail safely."
Engineering Logic: If a fire causes the ductwork to collapse, the Breakaway Connection (e.g., Plain "S" Slip or Hemmed "S" Slip) ensures the duct detaches without pulling the fire damper out of the wall.
Statutory Failure: Rigidly bolted or flanged connections at the wall penetration are frequent causes of BOMBA Safety Permit rejection.
| Component | 2026 Technical Requirement | Engineering Purpose |
| Duct Gauge | Minimum 1.2mm (G18) for Smoke Spill | Ensures structural integrity under high-heat/negative pressure. |
| Fire-Rated Paint/Wrap | Certified 120-minute Intumescent | Maintains "Insulation" rating to prevent heat ignition on the "safe" side. |
| Expansion Clearance | 6mm to 10mm Gap at Wall | Allows the damper/sleeve to expand without warping the fire wall. |
| Intumescent Mastic | BOMBA-Approved Fire-Stop | Seals the annulus between the duct sleeve and the structural opening. |
Technical Integrity: Our ducting solutions are engineered by mechanical specialists who understand the complex relationship between airflow thermodynamics and fire-life safety.
Zero-Subcontractor Model: We manage the fabrication, rigging, fire-safing, and statutory commissioning internally to ensure no detail of the UBBL 2026 is compromised.
GITA Support: Documented compliance with 2026 fire rated ducting standards is essential for claiming the 100% Green Investment Tax Allowance.
Is your AHU duct connection a fire-safety asset or a statutory liability? Contact EKG (Malaysia) SDN BHD today for a specialized Fire Rated Ducting & Connection Audit.
Are you installing fire-rated ducting for a new commercial high-rise or retrofitting an existing facility for its 2026 Fire Certificate renewal?
Lihat detail lebih lanjut tentang EKG M & E SDN BHD
Malaysia