In the 2026 Malaysian regulatory landscape, a Fire Rated AHU refers to a specialized mechanical assembly that satisfies both the Active and Passive fire protection mandates of the Fire Services Act 1988 (Act 341) and the Uniform Building By-Laws (UBBL) 2026. Following the February 3, 2026 updates to the Fire Services Regulations, these units must maintain structural integrity and prevent the migration of toxic smoke to secure a valid AHU Safety Permit.
At EKG (Malaysia) SDN BHD, we engineer Fire Rated AHU systems to ensure your project is Sterile, Silent, and Statutory-Compliant.
A "Fire Rated" designation is legally anchored by the AHU Safety Permit. This permit is a mandatory requirement for the building's Fire Certificate (FC) renewal and the Certificate of Completion and Compliance (CCC).
Smoke Control Integration: AHUs serving areas larger than 92.9 square meters (1,000 sq. ft.) must be interlocked with the Fire Alarm Monitoring System (FAMS).
Automatic Fire Signal AHU Shut-off: Upon detection of smoke, the system triggers an immediate power-cut to the IE5 EC Fan Walls to prevent the AHU from acting as a "smoke pump."
eFEIS 2.0 Digital Ledger: All integrated fire-safety hardware must carry the BOMBA "K" Mark and be verifiable via the eFEIS 2.0 digital platform.
A Fire Rated AHU installation is a combination of specialized casing materials and active detection hardware.
| Component | 2026 Technical Requirement | Engineering Purpose |
| Casing Material | Class 0 (Non-Combustible) | Prevents the AHU from contributing to the fire load of the plant room. |
| Motorized Fire Dampers | MS 558:2024 Certified | Automatically seals duct penetrations in fire-rated walls in under 20 seconds. |
| Duct Smoke Detectors | Photoelectric / UL-Listed | Triggers localized shutdown before smoke enters the recirculating air. |
| Fire-Rated (FR) Cabling | MS 2116 Compliant (Class C) | Ensures the shut-off signal survives high-heat events during a fire. |
For an AHU to be considered fire-rated, it must preserve the building's "Fire Cell" integrity.
2-Hour Fire-Resistance Rating: The AHU plant room must be enclosed by walls and slabs with a minimum 2-hour rating.
Intumescent Sealing: Every penetration (ducts, pipes, cables) must be sealed with BOMBA-approved intumescent fire-stop mortar or mastic.
BOMBA Approved Layout: The setup must provide a minimum 1000mm frontal clearance for emergency responders to access the Fireman’s Switch.
To obtain the Fire Rated certification, our engineers coordinate a physical witness test with BOMBA:
Smoke Injection Test: Non-toxic smoke is injected into the return air plenum to verify the millisecond-response of the shut-off protocol.
Damper Fail-Safe Audit: Verification that all motorized fire dampers revert to a "Closed" position upon loss of power.
Audit Readiness: All fire-safety coordinates are uploaded to your building’s Digital Twin (LOD 500) to serve as the "Digital Birth Certificate" for the 5-year periodic audit.
Technical Integrity: Our fire-rated systems are designed by mechanical engineers who specialize in the intersection of thermodynamics and active fire protection.
EECA 2024 Alignment: We utilize high-efficiency dampers that meet fire ratings without compromising your unit's Specific Fan Power (SFP) energy targets.
GITA Support: Documented compliance with 2026 fire standards is essential proof for claiming the 100% Green Investment Tax Allowance.
Is your AHU setup safe enough to pass a 2026 BOMBA audit? Contact EKG (Malaysia) SDN BHD today for a specialized Fire Rated AHU & Safety Permit Assessment.
Are you implementing these fire-rated standards for a new commercial high-rise project or for a fire-safety upgrade of an existing facility?