AC Casing Restoration

分类: Industrial AHU Casing & Panel Restoration 当前有货
欲了解更多详情,请游览我们的官方网站 eakon.com.my

详情

Industrial AHU Casing & Panel Restoration: AC Casing Restoration

In the 2026 Malaysian industrial landscape, AC Casing Restoration is a critical strategy for life-cycle extension and statutory compliance. Under the Energy Efficiency and Conservation Act (EECA) 2024, maintaining the structural and thermal integrity of an AHU casing is no longer just about aesthetics; it is a legal requirement to prevent "Energy Bleed." A compromised casing leads to air leakage and thermal bridging, which directly inflates your Building Energy Intensity (BEI) and can result in statutory fines.

At EKG (Malaysia) SDN BHD, our restoration services transform aged, corroded, or leaking AHU enclosures into high-performance, "as-new" assets that satisfy DOSH (JKKP) and Suruhanjaya Tenaga (ST) standards.


1. The Statutory Mandate: EECA 2024 & IAQ

A degraded casing is a primary source of non-compliance in 2026 building audits.


2. Core Restoration Modules

We utilize a multi-stage engineering process to restore the AHU's "Protective Shell."

Restoration Phase Technical Action Purpose
Surface De-Corrosion Mechanical scaling and chemical neutralization of rust. Stops structural degradation of the galvanized or stainless steel.
Antimicrobial Coating Application of medical-grade, low-VOC epoxy/polyurethane. Prevents bio-film growth and ensures compliance with DOSH IAQ codes.
Panel Re-Insulation Replacement of water-logged fiberglass with closed-cell PIR/PU. Restores the "Thermal Break" and prevents energy loss/sweating.
Gasket & Seal Overhaul Installation of high-density EPDM zero-leakage gaskets. Achieves the airtightness required for EECA 2024 compliance.

3. Engineering for "Structural and Thermal Health"

The restoration process focuses on the two most common points of failure in Malaysian industrial AHUs:

  1. Double-Skin Panel Integrity: We inspect the internal insulation. If the internal skin is breached, air can enter the insulation layer, creating a "Sponge Effect" that breeds bacteria. We restore the Air-Tight Inner Lining to ensure the air path remains sterile.

  2. Base Frame Reinforcement: High humidity in KL and Selangor often leads to "Base Rot." We perform structural welding and apply heavy-duty coal-tar epoxy to the base frame to ensure the AHU remains level and secure on its Vibration Isolators.

  3. Hinges & Fastener Audit: We replace corroded hardware with Marine Grade 316 Stainless Steel components, ensuring that inspection doors seal perfectly and do not "whistle" under high static pressure.


4. The "Fire Mode" Statutory Protocol

Restoration must align with the fire safety requirements of BOMBA (JBPM) 2026.


5. Why Partner with EKG (Malaysia) SDN BHD?

Is your AHU casing "sweating" away your energy budget and failing IAQ audits?

Contact EKG (Malaysia) SDN BHD today for a professional AC Casing Restoration & Statutory Compliance Audit.

更多 EKG M & E SDN BHD 相关资料
EKG M & E SDN BHD
EKG M & E SDN BHD ACMV Services Kuala Lumpur (KL), Fire Protection Services Selangor, Electrical Engineering Contractor Malaysia ~ EKG M & E SDN BHD