Chilled Water Pump Installation | Precision Integration by EKG (Malaysia) Sdn Bhd

Professional Installation Ensures Decades of Reliable, Efficient Operation
The installation of a chilled water pump is a critical procedure that directly impacts its performance, energy efficiency, and service life. Improper installation leads to vibration, premature failure, excessive noise, and energy waste. EKG (Malaysia) Sdn Bhd provides turnkey professional installation services, ensuring your new or replacement chilled water pump is integrated with precision engineering, correct alignment, and optimal system configuration for maximum reliability and efficiency.

Our Comprehensive Installation Process

We follow a strict, methodical protocol to guarantee flawless integration.

Phase 1: Pre-Installation Planning & Site Preparation

Phase 2: Precision Mechanical Installation

  1. Pump & Baseplate Positioning: Carefully position and level the pump assembly on the foundation.

  2. Grouting (if required): For large pumps, we use non-shrink grout to secure the baseplate, ensuring a solid, permanent foundation.

  3. Laser Shaft Alignment: This is the most critical step. We perform precision laser alignment between the pump and motor shafts to tolerances within 0.05 mm, eliminating destructive vibration and premature bearing/seal failure.

  4. Piping Connection & Support:

    • Install suction and discharge piping with proper supports to prevent pipe weight from stressing the pump casing.

    • Use braided flexible connectors on both suction and discharge to isolate vibration.

    • Install full-port isolation valves, strainers (on suction), pressure gauges, and thermometers as per design.

    • Ensure adequate straight pipe runs before and after the pump (typically 5-10 pipe diameters) for smooth flow.

Phase 3: Electrical & Control Integration

Phase 4: System Commissioning & Performance Verification

  1. Pre-Start Checks: Verify rotation, lubrication, and that all valves are in the correct position.

  2. System Filling & Venting: Fill the system slowly, bleeding all air from the pump and high points.

  3. Initial Start-Up & Monitoring: Start the pump, checking for unusual noise, vibration, and leaks. Record baseline amperage, pressure, and temperature readings.

  4. Performance Testing: Measure actual flow (using ultrasonic flow meters) and head, comparing it to the pump's performance curve to ensure it is operating at or near its Best Efficiency Point (BEP).

  5. System Balancing (if part of scope): Adjust balancing valves to achieve design flows to all terminal units.

Phase 5: Documentation, Training & Handover

Critical Installation Elements We Guarantee

Common Installation Mistakes We Prevent

Why Choose EKG for Installation?

Invest in an Installation that Maximizes Your Pump's Performance and Lifespan
A quality pump deserves a quality installation. Ensure your investment is protected from day one.

Contact EKG (Malaysia) Sdn Bhd to schedule professional chilled water pump installation. We handle the entire process from site preparation to final performance verification.