Ceiling Foundation

分类: Reinforced concrete steel framework setting 当前有货
欲了解更多详情,请游览我们的官方网站 lcjgroup.com.my

详情

Process
1.Install formwork and reinforcement bars according to structural specifications.
2.Pour concrete in one go to ensure solid compaction and level surface.
3.Cure the concrete for 7-14 days before removing the formwork when strength is achieved.

更多 LCJ GROUP SDN BHD 相关资料
LCJ GROUP SDN BHD
LCJ GROUP SDN BHD Interior Design and Renovation Company in Johor Bahru, Johor | Malaysia ~ LCJ GROUP SDN BHD